Laserfiche WebLink
N P'1 <br /> O O_ <br /> o <br /> College Park at Mountain House Specific Plan III <br /> oMitigation Monitoring and Reporting Program <br /> 3 Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility AAion Date Completed <br /> 0 <br /> a Between Central Parkway and the Alameda <br /> N County line (Receptor 14 in Figure 4.13-2 of <br /> the EIR) and the northern travel lane of <br /> Grant Line Road. The noise barriers may <br /> 0 <br /> consist of a wall,berm, or combination <br /> thereof.The exact location, height, and <br /> character of the noise barrier shall be <br /> determined by a noise consultant approved <br /> by the County.The sound barrier shall <br /> reduce outdoor noise levels at the center of <br /> the'front yards of the five existing <br /> w residences to below 65 dBA Ldn/CNEL. If <br /> Grant Line Road is widened at this location <br /> subsequent to construction of the sound <br /> barrier but before removal of the five <br /> residences under Specific Plan II, the sound <br /> barrier shall be relocated, as required. If the <br /> five existing residences are removed under <br /> Specific Plan II before occupancy of the first <br /> g residence under the College Park project, <br /> 3 this-mitigation measure shall not require <br /> implementation. This mitigation shall be <br /> a funded through fair-share payments by the <br /> a College Park developers. <br /> 4.13.4 Noise—Compatibility of Proposed Land Uses After construction Developer, in <br /> exceeding Predicted Noise Levels consultation with a <br /> The College Park developers shall implement qualified acoustical <br /> ,$ T the following measures: consultant <br /> o <br /> 3 Traffic Noise—Arterials. Before occupancy <br /> of the first residence proposed under the <br />