Laserfiche WebLink
� a <br /> o <br /> o College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> a <br /> ACollege Park project along each of the seven <br /> 8 arterial segments identified in Table 4.13-11 <br /> of the EIR, a sound barrier shall be <br /> constructed by the College Park developers <br /> along that arterial segment. The noise <br /> barrier may consist of a wall, berm, or <br /> combination thereof.The exact location, <br /> height and character of the sound barrier <br /> shall be determined by a noise consultant <br /> approved by the County. The sound barrier <br /> shall reduce outdoor noise levels at the <br /> g center of backyards of proposed adjacent <br /> single-family residences to below 65 dBA <br /> Ld„/CNEL and as close to 60 dBA LdWCNEL <br /> as feasible. This mitigation shall be funded <br /> through fair-share payments by the College <br /> r, <br /> Park developers. <br /> Traffic Noise—I.205.The County shall After construction; Developer, in <br /> v conduct annual acoustical monitoring at the Annual monitoring consultation with a <br /> F southernmost sites of the proposed qualified acoustical <br /> 3 residential, community park, community consultant <br /> college buildings/common area, and limited <br /> c industrial uses.The monitoring shall include <br /> e 24-hour measurements at the affected <br /> properties.At such time as the monitoring <br /> g` indicates that freeway noise levels at the <br /> _. above residential,community park, <br /> 5 <br /> 0 o community college, and limited industrial <br /> Z = sites are greater than the applicable noise <br /> thresholds (65 dBA CNEL for residential and <br />