Laserfiche WebLink
3 r^ <br /> o � <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> o Implemenonsihilitation <br /> Res Implementation&Verification <br /> Mitigation Measure Timing/Schedule <br /> m P ty Action Date Completed <br /> a <br /> A 4.14 VISUAL QUALITY <br /> A <br /> 4.14.1 Visual Quality—Alteration of Visual Character During Developer, in <br /> along Grant Line Road from Tree Removal construction coordination with <br /> a The College Park developers shall provide new the MHCSD <br /> OR trees on both sides of Grant Line Road and in <br /> 3 the median strip, from Mountain House <br /> Parkway to the Alameda County line, at a 3:1 <br /> ratio to the trees to be removed, or as required <br /> by the Mountain House Community Services <br /> District (MHCSD) Design Manual,whichever is <br /> greater.The trees to be planted shall be in <br /> m conformance with the MHCSD Design Manual, <br /> Chapter 3, for Grant Line Road. <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista During and after Developer, in <br /> from Mountain House Parkway construction coordination with <br /> The following measures shall be implemented MHCSD <br /> o^ by the College Park developers: <br /> o If the landscaping and edge treatments <br /> o required by the MHMP and MHCSD <br /> eDesign Manual have not been developed on <br /> 3 the east side of Mountain House Parkway <br /> fronting the Pombo property by Specific <br /> Plans I or II at the time the proposed pond <br /> o is developed on the Pombo property, the <br /> ` N required landscaping and edge treatments <br /> on the east side of Mountain House <br /> Parkway in the vicinity of the proposed <br /> pond shall be installed by the College Park <br /> i = developers.This shall be done concurrent <br />