Laserfiche WebLink
8 o College Park at Mountain House Specific Plan III <br /> oMitigation Monitoring and Reporting Program <br /> z Mitigation Measure Timing/Schedule Implementation Implementation&Verification <br /> 0 <br /> Responsibility Action Date Completed <br /> owith development of the pond. <br /> If the aboveground pond option is developed, <br /> the west-faring pond berm shall be densely <br /> landscaped by the College Park developers. In <br /> a <br /> addition, the berm shall be 'constructed by the <br /> College Park developers using contoured and <br /> rounded slopes to avoid angular face slopes. <br /> This shall be done concurrent with development <br /> of the pond. <br /> A <br /> V <br /> 3 <br /> 0 <br /> 0 <br /> 3 <br /> 0 <br /> 0 <br /> S <br /> a <br /> 0 <br /> ii <br /> A <br /> A <br /> O <br /> Om <br /> tw <br /> o a <br /> 3 � <br />