Laserfiche WebLink
00 <br /> 0, o <br /> CD <br /> o° m College Park at Mountain House Specific Plan III <br /> c. m Mitigation Monitoring and Reporting.Program <br /> n m Implementation&Verification <br /> c Implementation <br /> Mitigation Measure Timing/Schedule <br /> c ResponsibilityAction Date <br /> = Completed <br /> _ <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> CD Land Uses construction,and Community <br /> to The College Park developers shall implement the During design phase Development <br /> c� following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> v Irrigation District(BBID)canals from proposed conjunction with the , <br /> urban development until such time as the canals developer,and in <br /> are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> y gas pipelines within the PG&E–Chevron <br /> easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> 6, any new units in the residential area in and south <br /> of Chant Line Village and adjacent to the County l <br /> m line. <br /> _ <br /> n <br /> C <br /> CD <br /> S <br /> v <br /> o m <br /> � p <br /> 3 <br />