My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gm <br /> = o <br /> 0 D <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> a 4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Etasting Agricultural Zoning or Williamson of interim land conjunction with the <br /> Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> mitigation measure: <br /> T At such time m the interim land disposal of i <br /> treated wastewater at the Pombo property is <br /> 3 discontinued,GNY, LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD, in <br /> Adjacent Agricultural Operations conjunction with the <br /> A < Before development,the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> 7 water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> m <br /> W <br /> 4.6 CULTURAL RESOURCES <br /> RL 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> Resources developer,and in <br /> If discovery of unlmown cultural materials is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> = the construction site where the discovery was made archaeologist,if <br /> m y shall be halted.The College Park developers or needed. <br /> c <br /> CD <br /> construction contractor shall contact the San Joaquin <br /> 0 m County Community Development Department <br /> ?, (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> 0) notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a`anique archaeological <br />
The URL can be used to link to this page
Your browser does not support the video tag.