My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> w O <br /> o College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> v <br /> Completed <br /> n maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> 'g during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> � discharges; <br /> < ST7ecifv BW inspection protocols to ensure that <br /> d <br /> the BMPs are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> ,n < Identify measures to prevent or clean up spills of <br /> hazardous materials used for equipment <br /> operation and hazardous waste; <br /> FIL <br /> d < Identify emergency procedures for responding to <br /> OC spills; <br /> OC < Identify BMPs that sball be used in all <br /> v subsequent site-development activities; l <br /> _ < Identify personnel training requirements and <br /> yprocedures that will be used to ensure that <br /> m workers are aware of permit requirements and <br /> dproper installation and performance inspection <br /> CD <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> msupervisory duties related to implementation of _ <br /> the SWPPP; and <br /> < Require all construction contractors to retain a <br />
The URL can be used to link to this page
Your browser does not support the video tag.