Laserfiche WebLink
M <br /> w O <br /> o College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> v <br /> Completed <br /> n maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> 'g during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> � discharges; <br /> < ST7ecifv BW inspection protocols to ensure that <br /> d <br /> the BMPs are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> ,n < Identify measures to prevent or clean up spills of <br /> hazardous materials used for equipment <br /> operation and hazardous waste; <br /> FIL <br /> d < Identify emergency procedures for responding to <br /> OC spills; <br /> OC < Identify BMPs that sball be used in all <br /> v subsequent site-development activities; l <br /> _ < Identify personnel training requirements and <br /> yprocedures that will be used to ensure that <br /> m workers are aware of permit requirements and <br /> dproper installation and performance inspection <br /> CD <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> msupervisory duties related to implementation of _ <br /> the SWPPP; and <br /> < Require all construction contractors to retain a <br />