Laserfiche WebLink
J <br /> 0 0 <br /> 0) O <br /> � c <br /> A <br /> mm College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Q d Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> ResDate <br /> ponsibility Acton Completed <br /> copy of the approved SWPPP on the construction <br /> 2 site. <br /> 0 <br /> 0 4.9 PUBLIC HEALTH AND SAFETY <br /> CD <br /> -0 4.9-1 Public Health and Safety—Possible Exposure to Before and during San Joaquin County <br /> Pre-Existing Hazardous Materials During construction; Environmental Health <br /> Construction Before demolition, Department and the <br /> v The College Park developers shall implement the renovation,or Central Valley <br /> following measures: modification of RWQCB,in <br /> < Project grading,excavation,and other earth- structures conjunction with the <br /> moving activities at the project site and off-site developer and a <br /> infrastructure locations shall be monitored at the qualified hazardous <br /> County's discretion by qualified hazardous materials expert - <br /> materials experts(either qualified County staff or <br /> consultants)for signs of potential pesticide, <br /> hydrocarbon,or other contamination.If the <br /> County or consultants observe soil discoloration, <br /> noxious odors,or other signs of potential <br /> — contamination,Phase B testing(excavation, <br /> m laboratory testing of soil,possibly groundwater <br /> testing)shall be undertaken,and any <br /> recommendations made by the consultants shall <br /> be implemented. <br /> The San Joaquin County Environmental Health <br /> m Department shall have regulatory authority over <br /> the investigation and clean-up of contamination <br /> n from underground storage tank releases and would <br /> CD provide"no further action required" <br /> a determinations for that source of contamination. <br /> o All aboveground storage tanks(ASTs)and <br /> 3 m underground storage tanks(USTs)at the project <br /> �0 O site shall be removed under the supervision of a <br /> qualified hazardous material expert in accordance <br /> with applicable regulations and removal permit <br />