Laserfiche WebLink
K rn <br /> r: o <br /> ca' D <br /> ~ College Park at Mountain House Specific Plan HI <br /> 25 <br /> Mitigation Monitoring and Reporting Program <br /> K Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> �. I Responsibility Action <br /> n Completed <br /> nrequirements from the County Environmental <br /> Health Department.Dairy waste ponds or any <br /> other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> n accordance with applicable regulations and <br /> reouirements from the Central Vallev RWQCB or <br /> the California Department of Toxic Substances. <br /> 3 <br /> This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts.If the testing <br /> reveals contamination,the regulatory agencies <br /> o shall be contacted,any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> (i.e.,septic systems,refuse piles,waste ponds, <br /> electrical transformers containing PCBs)on the <br /> project site and off-site infrastructure sites shall be <br /> FIL identified and removed under the supervision of <br /> °^ qualified hazardous materials experts and in <br /> oaccordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> = the above has taken place before issuance of <br /> Cn cbuilding permits.If the experts observe potential <br /> soil contamination or noxious odors associated <br /> with these facilities,the soils underlying these <br /> ?. facilities shall be sampled and tested by the <br /> experts. If the testing reveals contamination,the <br /> regulatory agencies shall be contacted,any <br /> K = recommendations made by the experts shall be <br /> implemented,and the County Environmental <br /> i <br />