Laserfiche WebLink
F. m <br /> 0 <br /> n <br /> 5 College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o2. <br /> 6 Mitigation Measure Timing/Schedule <br /> Implementation Implementation&Verification <br /> Responsibility Date <br /> Acton Completed <br /> n during the nesting season(February 15—August <br /> 7 31),pre-construction surveys shall be conducted <br /> o during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity.The survey shall be conducted within <br /> 0 <br /> the 2 weeks before construction or tree removal <br /> begins. if any active nests are found,a setback of <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> o ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> D Loss of Active Nests conducted 2 weeks <br /> m The College Park developers shall request coverage prior to construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> w y <br /> site supports suitable habitat for loggerhead shrike, <br /> S California homed lark,or tricolored blackbird. if <br /> o` W SJCOG determines suitable habitat is present on or <br /> $ adjacent to a given project site,the following <br /> SJMSCP incidental take avoidance and minimisation <br /> c -0 measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br /> W <br />