Laserfiche WebLink
I` <br /> Cl) C1 <br /> m o <br /> CD <br /> College Park at Mountain House Specific Plan III <br /> c. d Mitigation Monitoring and Reporting Program <br /> nd Implementation&Verification <br /> � Mitigation Measure Timing/Schedule I Implementation <br /> c <br /> c Responsibility Action Date <br /> Completed <br /> �• begins during the nesting season(April 1—August <br /> 0 31),pre-construction surveys shall be conducted <br /> N during the nesting season in suitable nesting <br /> m habitat within 100 feet of areas of project <br /> Cn <br /> activity.The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead / <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored - <br /> Blackbird.If project construction begins during <br /> the nesting season(April 1—August 3l),pre- <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> K within 500 feet of areas of project activity.A <br /> setback of 500 feet from California homed lark <br /> and tricolored blackbird nesting areas shall be t <br /> d <br /> established and maintained during the nesting <br /> a season for the period encompassing nest building <br /> and continuing until fledglings leave nests.This <br /> o setback applies whenever construction or other <br /> a. ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> M are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> * 4.10-9 Biological Resources--Conversion of San Joaquin Before construction SJCOG,in <br />