Laserfiche WebLink
setback may be granted when the owner of such agricultural land has indicated in writing that <br /> the land will no longer be used for agricultural production. <br /> Timing: Improvement plans approved by CDD and MHCSD prior to Final Map approval. <br /> 15. Agricultural Operation Phasing: An Agricultural Buffer and Conversion Phasing Plan shall <br /> be submitted to the Community Development Department and approved by the Director. The <br /> plan shall incorporate the following: <br /> • Phasing of areas from agricultural to urban use—locations and time frames; <br /> • Irrigation water supply and service plan approved by BBID; <br /> • BBID encroachment permits; <br /> • Temporary buffering that includes a 100-foot setback(or as adjusted by condition 15) <br /> between the edge of development and ongoing agricultural operations as the project <br /> builds out; <br /> • Permanent setbacks; <br /> • Landscape buffers; and <br /> • Fencing, signage or other suitable measures to minimize noise, spray drift and limit <br /> the potential for trespass on agricultural lands and BBID facilities. <br /> In addition, the plan shall address the following: <br /> • Chemical applications <br /> • Dust management <br /> Timing: Condition shall be met prior to approval of the Final Map. [MP policies 3.2.4 g), h) <br /> and i) and Specific Plan I Policy 4.2.2 (h)] <br /> NOISE <br /> 16. Soundwalls: The developer(s)shall construct a soundwall (i.e., "Community Wall")along <br /> the western right-of-way of De Anza Boulevard,from Central Parkway to the northern <br /> boundary of the Mountain House Business Park.The soundwall shall not exceed 7 feet in <br /> height and shall be consistent with the Master Plan and the MHCSD Design Guidelines. <br /> Where the soundwall would exceed the 7-foot height standard, berms shall be used to reduce <br /> the overall soundwall height to said limit. Where any opening in the soundwall is proposed <br /> for pedestrian access, "return"walls shall be provided at said opening. These return walls <br /> shall continue along the depths of the adjoining residential yards and shall extend no less <br /> than to the rear yard setback. With respect to these return walls, CDD may allow the <br /> soundwall to be increased a maximum of one additional foot on the street side of the local <br /> road or collector street to compensate for varying pad height and berming on the adjacent <br /> arterial roadways. Entry walls into the neighborhood may be increased more than the <br /> additional one-foot, subject to CDD approval. The proposed soundwall (or portion thereof) <br /> along theses roads may be constructed to a height that is less than the height standard <br /> specked, subject to confirmation of a noise study prepared by a noise consultant approved <br /> by CDD and MHCHD. [Master Plan Policies 4.2.7(d) and (e).] <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to approval of the Final <br /> Map of the Mountain House Business Park for the area north of Central Parkway, between <br /> De Anza Boulevard and Mountain House Parkway, or prior to approval of the first Final Map <br /> for the residential portion of the Remainder Parcel of the Tentative Map, whichever occurs <br /> first. <br /> 17. Outdoor Noise Levels: For parcels 16 and 26, which are proposed as sites for hotels, best <br /> available noise reduction measures shall be implemented by the developer(s)to reduce noise <br /> levels in primary outdoor activity areas from transportation noise sources to no more than an <br /> Ldn of 60 dB. The developer(s)shall specify what reasonable measures have been taken in <br /> this regard as part of a noise study prepared for parcels 16 and 26. Said noise study shall <br /> 4 <br />