Laserfiche WebLink
Revised Conditions of Approval <br /> GX-90-0004 <br /> Page 2 <br /> "T") <br /> (b) Submit the excavation plans to the District for review <br /> and approval. <br /> (c) The excavation shall provide for a fifteen foot (151 ) <br /> access road adjacent to the existing District pipeline <br /> and open ditch. Side slopes of 3 : 1 shall start at the <br /> edge of the fifteen foot (151 ) access road. <br /> (d) Excavation equipment shall not be permitted to cross <br /> existing pipelines. <br /> 4. PACIFIC GAS AND ELECTRIC COMPANY <br /> (a) Pacific Gas and Electric Company maintains overhead power <br /> facilities within the proposed excavation area. Cuts <br /> within fifteen feet (15' ) of a pole, and fill that would <br /> diminish existing ground clearance are not allowed. <br /> 5. PLANNING DIVISION <br /> (a) Performance Guarantee. To ensure that the excavation is <br /> completed in conformance with the approved permit, the <br /> operator shall secure a performance bond or other <br /> financial security sufficient to cover the cost of <br /> rehabilitation of the site for agricultural use. The <br /> form of the bond or other financial security shall be <br /> found acceptable by the County Counsel. <br /> (b) A written notification of work schedules shall be <br /> provided to the County by the applicant prior to any <br /> grading or excavation. <br /> (c) If the excavation does not commence by January 12, 1992 , <br /> the permit shall lapse and become void. <br /> (d) Phase 1 shall be completed prior to August 31, 1991, and <br /> shall require a performance guarantee of $14 , 100. 00 . <br /> Phase 2 shall be completed prior to February 28, 1994, <br /> and shall require a performance guarantee of $15, 600. 00. <br /> Phase 3 shall be completed prior to August 31, 1994, and <br /> shall require a performance guarantee of $8 , 050. 00 . <br />