Laserfiche WebLink
Mike Quartaroli <br /> June 4 , 1990 <br /> Page 2 <br /> Submit an estimate of the cost of rehabilitation to Dick Heib at <br /> the Department of Public Works. The cost should include grading <br /> for irrigation and the soil required for the fill indicated on <br /> the grading plan. <br /> The application cannot be processed until the soils report and <br /> the operational statement have been submitted . If the required <br /> information is not submitted by June 15 , 1990 , the project will <br /> be considered withdrawn. <br /> If you have any questions, please contact me at 468-3190 . <br /> Sincerely, sD <br /> CHANDLER T. MARTIN <br /> Associate Planner <br /> CTM:vj <br /> cc: Public Health Services <br /> Building Inspection Division <br /> Public Works Department <br />