Laserfiche WebLink
I <br />., <br />PouiN <br />THOMAS R. FLINN <br />DIRECTOR <br />Lid p <br />THOMAS M. GAU <br />CHIEF DEPUTY DIRECTOR <br />MICHAEL SELLING <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />ROGER JANES <br />BUSINESS ADMINISTRATOR <br />June 22, 2010 <br />t <br />MEMORANDUM <br />TO: Rick Griffin, Senior Planner <br />Community Development Department <br />CONTACT PERSON: Rick Griffin <br />FROM: Alex Chetley, Engineer V <br />Public Services Division <br />In <br />P.O. BOX 1810 -1610 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 466-3000 FAX (209) 468-2999 <br />www.sjgov.org/pubworks <br />RECEIVED <br />JUN, 2 4 2010 <br />Community Development Dept <br />SUBJECT: PA -1000113; A Minor Subdivision application to subdivide two existing parcels into one 2.3 - <br />acre home -site parcel and a 46.36 -acre remainder; located on the northeast corner of Jack tone <br />Road and Clinton South Avenue. (Supervisorial District 4) <br />PROPERTY OWNER: Arthur Van Groningen APPLICANT: Quartaroli & Associates <br />ADDRESS: 20500 S. Jack Tone Road, Ripon APN: 245-160-24 & 31 <br />INFORMATION: <br />The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br />Jack Tone Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br />Clinton South Avenue has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br />The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br />the time of building permit application. <br />The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br />at the time of building permit application. <br />