Laserfiche WebLink
(§ 6.1)Percolation testing was conducted on proposed Parcels 1,2, 3 and 4 as illustrated on the Tentative <br /> Map found in Appendix C. These test locations maintain sufficient distance between future septic systems <br /> that may be installed and surrounding wells. The following information describes the preparation of the <br /> percolation test borings and the actual perc testing: <br /> (§6.2,6.3 and 6.5) On September 14, 2005, 1140 hrs, one shallow perc test boring and one deeper test <br /> boring,varying from 9.5 to 21 feet were drilled with a truck mounted drill rig on proposed Parcels 1, 2, 3 and <br /> 4. The sidewalls of the shallow borings were scored with a pry-bar and the loose material removed. Two <br /> inches of fine gravel was placed at the bottom and three-inch perforated PVC pipe was inserted in each of the <br /> test borings. All borings were pre-saturated on September 15, 2005 at 0900 hrs with 12 inches of water. <br /> (§6.4)On September 16, 2005, 0805 hrs,percolation testing commenced for all eight borings. There was <br /> standing water after the 24-hour soak period in all four of the shallow perc tests borings, as illustrated in Table <br /> 1 below. Consequently,EHD Perc Test Procedure#1 was conducted for these two borings. <br /> There was no standing water after the 24-hour soak period in the four deep test borings. Therefore, <br /> Percolation EHD Test Procedure#2 was performed for these borings. The last half hoar of the tests was <br /> witnessed by Lisa Medina of the San Joaquin County Environmental Health Department. The maximum <br /> acceptable perc rate is 60 min/in for shallow perc tests and 30 min/in for the deep tests. <br /> V (§ 5.4 and 6.8)The following Table illustrates the proposed Parcel number,potential septic system structure <br /> based on depth of passing perc rates,proposed acreage,post soak period status and perc test results for the <br /> respective perc test depths: <br /> TABLE 1 <br /> PERCOLATION TEST RESULTS <br /> PROPOSED PARCEL PROPOSED PERC TEST DEPTHS: POST SOAK PERC TEST <br /> AND POTENTIAL ACREAGE SHALLOW PERIOD RESULTS <br /> SEPTIC SYSTEM DEEP STATUS <br /> STRUCTURE <br /> Parcel r 5.0 Acres 42 INCHES —4Inches FAILED <br /> Leachlines and Sumps Standing Water (0 min/in) <br /> 114 INCHES(9.5 FEET) No Standing 3"VEMt/in <br /> Water in Hole <br /> Parcel 2 5.0 Acres 42 INCHES —3Inches FAILED <br /> Leachlines and Limited Standing Water (0 min/in) <br /> Depth Seepage Pits <br /> 252 INCHES(21 FEET) No Standing 449.wwLin <br /> Water in Hole <br /> Parcel 5.0 Acres 42 INCHES 5Inches FAILED <br /> Leachlines and Limited Standing Water (250 min/in) <br /> Depth Seepage Pits <br /> 240 INCHES(20 FEET) No standing <br /> Water in Hole <br /> Parcel 4 5.0 Acres 42 INCHES —3 Inches FAILED <br /> Leachlines and Limited standing Water (250 min/in) <br /> Depth Seepage Pits <br /> 240 INCHES(20 FEET) No Standing . min/in <br /> Water in Hole <br /> Page-3- <br /> Chesney Consulting <br />