Laserfiche WebLink
Conditions of Approval <br /> SA-90-60 <br /> Page 5 <br /> 4 . Office of Emergency Services: <br /> a. A hazardous materials management plan (RMPP) or an <br /> exemption certificate is required prior to issuance of <br /> a business license. <br /> 5. California Regional Water Ouality Control Board: <br /> a. The project shall operate in accordance with the "Water <br /> Quality Safeguards" submitted to the California Regional <br /> Water Quality Control Board. <br /> b. The project will be constructed and operate in compliance <br /> with the "Conditions for Waiver of Waste Discharge <br /> Requirements at Retail Fertilizer Facilities. " .Failure <br /> to do so will require the Regional Board to issue waste <br /> discharge requirements for the facility. <br /> 6. Bureau of Fire Prevention: <br /> a. Provide water for fire protection as per NFPA 1231 <br /> "Standard on Water Supplies for Suburban and Rural <br /> Firefighting. " <br /> b. If gates are to be locked, provide a key lock box "knox <br /> box" for fire department access. <br />