Laserfiche WebLink
U.IN <br /> COUNTY OF SAN JOAQUIN <br /> THOMAS R. FLINN <br /> o Z< DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.0.80%1810-1810 E.HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> • 09�%PUPNAp• FA(209)468-3000 STEVEN DEPUTY WIINKLDIRECTOR <br /> X(209)468-2999 <br /> HENRY M.HIRATA <br /> OIRECTOR <br /> April 17, 1996 <br /> MEM2RAND-12M f <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> APR 171996 <br /> Community Development Department ;UMMUIINITY UtY[LUt-MtiY I Utjx(. <br /> CONTACT PERSON: Chandler T. Martin PLANNING DIVISION <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-92-40 A REVISIONS OF APPROVED ACTIONS APPLICATION FOR AN <br /> APPROVED SITE APPROVAL APPLICATION FOR AN AGRICULTURE FERTILIZER <br /> APPLICATION SERVICE AND RETAIL SALE OF FERTILIZER AND AGRICULTURE <br /> CHEMICALS. THE REQUEST IS TO PHASE THE PROJECT IN FOUR PHASES OVER <br /> SIX YEARS. THE SITE IS LOCATED ON THE EAST SIDE OF JACK TONE ROAD, <br /> 2,000 FEET NORTH OF VERDON ROAD. (DISTRICT 5). <br /> APPLICANT: Tri-Ag. Service, Inc. APN: 183-080-02 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Jack Tone Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> RECOMMENDATIONS: <br /> Conditions of Approval 2d. and 2e. shall be revised as follows: <br /> 2d. The Traffic Impact Mitigation Fee will be required when pareels dre developed. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $656.00 1;884:90 <br /> per 1,000 gross square feet of building as "Warehouse" in the Escalon area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) Contact the Department of Public Works Public <br /> Facilities Division ((209) 468-3055) for anv alternate method of 1avment allowed for PhasinIZ. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> 2e. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable at the time of building permit application. Tile fee currently is $125.00 <br /> 88.89 per 1.000 gross square foot of building as "Warehouse". if there is me building permit <br /> exempt.ire The fee shall be automatically increased on January 1 of each <br /> year at the rate of 6.9 percent. An additional 3.5 percent shall be added to the fee upon payment <br /> for processing and administering the program. <br /> (Resolution R-91-327) <br /> TML•RH:ti <br /> PSID13715 <br /> E: Manuel Lopez, Deputy Director/Development <br />