Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-04450(MS) <br /> 5. Drainage from Parcel 1,2, and 3 shall be retained on-site by a retention basin(18-inch maximum depth). <br /> Drainage for each parcel shall be calculated by a Registered Civil Engineer or an Architect prior to <br /> release of Building Permit and shall be noticed by a statement on the Parcel Map. <br /> (Development Title Section 9-1135.9) <br /> 6. This area has been subject to historic flooding. Therefore,prior to recordation, a note shall be added to <br /> the Parcel Map which specifies that all new structures or substantial improvements constructed on Parcel <br /> 1, 2, 3, and 4 shall be elevated a minimum of two (2) feet above the highest grade adjacent to the <br /> structure. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DG:SH:ar <br /> P ICOAA1HNi5\ k"20 TA-OO "..wpd <br />