My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012250
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JONES
>
26639
>
2600 - Land Use Program
>
PA-1700043
>
SU0012250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:42 AM
Creation date
9/6/2019 10:33:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012250
PE
2626
FACILITY_NAME
PA-1700043
STREET_NUMBER
26639
Direction
E
STREET_NAME
JONES
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24718012
ENTERED_DATE
3/26/2019 12:00:00 AM
SITE_LOCATION
26639 E JONES RD
RECEIVED_DATE
5/28/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\J\JONES\26639\PA-1700043\SU0012250\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Previously Approved <br /> CONDITIONS OF APPROVAL <br /> PA-1700043 <br /> ROCHE BROTHERS/NORMAN WILSON <br /> A One-year Time Extension for a previously approved Use Permit Application No. PA-1700043 was <br /> approved by the Planning Commission on July 18,2019. The effective date of approval is July 18,2019. <br /> This approval will expire on May 28, 2020,which is one year from the previous expiration date, unless <br /> (1) all Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> issued and remain in force, and (3) all necessary permits from other agencies have been issued and <br /> remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact Staffs Alisa Goulart, 209-468-0222) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. This project is a one-year Time Extension application for a previously approved Use Permit application <br /> to convert an existing nut processing facility into a food manufacturing facility, to be completed in <br /> five phases over eight (8) years. The effective date of approval is November 16, 2017. The one- <br /> year Time Extension will extend the project to nine (9) years. (Use Type: Agricultural Processing — <br /> Food Manufacturing) <br /> 1. Phase 1, with building permits to be issued within eighteen (18)thirty 30 months of the effective <br /> date of approval, includes the construction of a 35,907 square foot food manufacturing building <br /> with cold storage, a 27,000 square foot cold storage and storage building, and a 4,000 square foot <br /> storage building. <br /> 2. Phase 2, with building permits to be issued within twG (2) three 3) years of the effective date of <br /> approval, includes the construction of a 4,800 square foot equipment repair building. <br /> 3. Phase 3, with building permits to be issued within tree (3) four 4 years of the effective date of <br /> approval, includes the construction of a 3,600 square foot office building. <br /> 4. Phase 4, with building permits to be issued within five (5) six 6 years of the effective date of <br /> approval, includes the construction of a 50,400 square foot storage building. <br /> 5. Phase 5, with building permits to be issued within eightnine 9 years of the effective date <br /> of approval, includes the construction of a 58,800 square foot storage building. <br /> These conditions of approval are in addition to the conditions of approval for PA-0500481 and PA- <br /> 1000012. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> PA-1900018 (UP) Conditions of Approval - Findings 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.