Laserfiche WebLink
R4U1ry COUNTY OF SAN JOAQUIN THOMASM. GAU <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810- 1810 E.HAZELTON AVENUE MANUEL SOLORIO <br /> • �` :r• STOCKTON,CALIFORNIA 95201 INTERIM DEPUTY DIRECTOR <br /> (209) 468-3000 <br /> THOMAS R. FLINN FAX (209) 468-2999 <br /> INTERIM DIRECTOR STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> August 14, 2001 RECh<sVFI-` <br /> AUG 16 2001 <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director Dommunity Development Dept. <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> GK- <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-54 A SITE APPROVAL APPLICATION TO RELOCATE AN <br /> EXISTING AGRICULTURE FLYING BUSINESS TO KASSON ROAD, <br /> LOCATED ON THE WEST SIDE OF KASSON ROAD, 200 FEET NORTH <br /> OF LORENZEN ROAD. (DISTRICT 5). <br /> APPLICANT: Thomsen Brothers, Inc. APN: 239-110-07 and <br /> 239-180-03 <br /> INFORMATION: <br /> The site is currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. The 100 year Flood Elevation will be approximately 25 Feet NGVD. <br /> Kasson Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 <br /> feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $710 per 1,000 <br /> gross square foot of building designated as Manufacturing in the Tracy area. The fee shall <br /> be automatically adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record. A credit may be allowed if it can be verified <br /> that the existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00433) <br />