Laserfiche WebLink
r <br /> Recommendations ; <br /> Action <br /> It is recommended that the Planning Commission: <br /> 1. Approve the Negative Declaration;and <br /> 2. Approve the Revisions of Approved Actions application for OX-89-0003 with a new expiration <br /> date of February 20,2030;along with the previously approved Excavation/Reclamation Plan and <br /> previously approved Findings and Revises!Conditions of Approval contained in the staff report. <br /> Previously Approved Findings <br /> 1. The proposal is for the removal of scarce mineral resources and not for the removal of prime farmland <br /> E because no topsoil will be removed, and only sand will be extracted from the site.Approximately 500,000 <br /> t <br /> cubic yards of sand will be excavated over a five-year period. <br /> 2. The excavation'will not have a detrimental effect on any surrounding agricultural land because dust <br /> control measures will be utilized during excavation and processing operations, excessive noise will not be <br /> generated on the site as a result of the project,and the days and hours of operation will be limited. <br /> 3. 'The proposed rehabilitation of the property, upon completion of the excavation,will leave the property in <br /> a condition which will allow its reuse because the reclamation proposed will result in the sand bar portion <br /> of the site being gently sloped down to the San Joaquin River,which will prevent that portion of the site <br /> from being subject to continued erosion during flood stages of the river. <br /> 4. Issuance.of the permit shall not be significantly detrimental to the public health,safety, or welfare or be <br /> injurious to the property or improvements in the vicinity anrt district in which the property is located <br /> because dust control measures will be implemented, no excavation activities will occur within the San <br /> Joaquin River, and a nine-acre wetlands area near the site will be created to off-set the loss of any <br /> vegetation from the project site. <br /> Revised Conditions i <br /> i <br /> Unless otherwise specified, the approved use shall not be established nor building permits issued until the <br /> applicant has fulfilled all Conditions of Approval. <br /> I <br /> 1. PLANNIN9 DIVISION ! <br /> a. The sandbar-skimming portion of the <br /> p project shall be. completed within five years of the <br /> commencement of operations. The on-going yearly maintenance skimming to maintain the n'ver <br /> sand bar shall be permitted for 45 35 years thereafter. If the excavation does not <br /> commence within 18 months after the date of approval, the permit is terminated. The applicant shalt <br /> notify the Planning Division in writing when the sandbar-skimming operations begin. The gua <br /> expiration date is February 20.2030. <br /> b. A performance guarantee is required to ensure site rehabilitation and compliance with Conditions of I <br /> Approval. The amount of the guarantee is and will be fully in force for any phase which is being <br /> excavated. The estimated cost of rehabilitating each phase must be reviewed by the Department of <br /> Public Works and the McMullin Reclamation District No. 2075. The type of financial guarantee <br /> San Joaquin County QX-89-0003/Alegre <br /> Community Development Page 4 <br />