Laserfiche WebLink
the existing riparian habitat, whichever is greater. Water-dependent uses may be permitted in this <br /> buffer. (Section 9-1510.5) <br /> Therefore, this project cannot proceed until a qualified biologist conducts an environmental <br /> assessment of the extent of the riparian and woodland habitat, identifies project impacts, and <br /> identifies mitigation measures that bring the project into compliance with the Trees and Riparian <br /> Habitat portions of the Development Title. <br /> Other issues that will need to be addressed include: <br /> NOISE <br /> A noise study shall be prepared by a qualified noise consultant. The study must determine the <br /> projects noise impacts, and any mitigation required to assure that the project complies with the noise <br /> ordinance(Section 9-1025.9) <br /> SAFETY <br /> A revised project description will be required that provides the operational details of the skeet <br /> shooting range. Include any safety features that will be employed, how the mobile stations will be <br /> used,how patrons and surrounding property owners will be protected,what kind of shot will be used, <br /> and any other information pertinent to the health and safety of the public. <br /> OFFICE <br /> The office being requested in the application is not on the Site Plan.A recreational vehicle cannot be <br /> used for an office. All structures and roads need to be shown on the Site Plan. <br /> If the biological, noise, and safety studies identify potentially significant impacts and mitigation <br /> measures to reduce those impacts to less than significant, the Initial Study will be revised and <br /> reposted for a minimum of 20 days. The Community Development Department will not generate <br /> conditions of approval until the required studies are completed,and mitigation measures, if any,have <br /> been identified. <br /> RG:vb <br /> PA02637 <br /> Attachments <br /> C: William Ohm <br /> Ron Leachman <br />