Laserfiche WebLink
sanJoaquin county Project Description <br /> 2.4.4 Neighborhood 1 <br /> • Redesignate approximately 20 acmes from Commercial Recreation CS to PF(Public Facilities- <br /> Community Park).This is the relocation of North Community Park from its current location <br /> east of Central Fark-way and north of Syron Road. <br /> Reference Figure 2-4 for Neighborhood I existing and proposed amendments. <br /> 2,4.5 Neighborhood L <br /> • Redesignate 22 acres from Community Park to PF(Public Facnities-Private). <br /> • Relocate the K-S School approximately 1,600 feet south of its prior proposed location. <br /> • Relocate Neighborhood Paris approximately 1,300 feet south of its prior proposed location. <br /> • Relocate 1-acre Neighborhood Commercial site approximately 1,309 feet south-east of its <br /> etasting location. <br /> Reference Figure 2-4 far Neighborhood L existing and proposed amendments. <br /> 2,4.6 Utilities <br /> Dnsite utilities would include electricity and natural gas,domestic water,wastewater,and storm <br /> drainage facilities,which were all analyzed in the 1994 MEIR and 2D04[SIM ND.All onsite utilities <br /> would be designed in accordance with the current Master Plan and Specific Plan IL applicable <br /> county codes,standard engineering practices.and MHCSD standards and specifications,and would <br /> not substantially change from the Specific Plan IL <br /> 2.4.6.1 Energy <br /> As under the current approved Master Plan and Specific Plan 11,electricity would still he provided by <br /> Modesto Irrigation District(MID)and gas service provided by Pacific Gas&Electric Company <br /> (PG&E).Thesetwo entities would be responsible for constructing any necessarye_t-tension oftheir <br /> infrastructure to serve the project.A MID substation was constructed outside Mountain House,on <br /> the south side of Kelso Road in Alameda County and would serve the project.Construction of this <br /> substation was the subject of a separate environmental review document(Modesto Irrigation <br /> District 2018). <br /> 2.4.6.2 Domestic Water <br /> MHCSD provides potable water to the Mountain house colnlnunity and would provide water to the <br /> project.Domestic seater demand is based upon Land use and dernand factors established by the <br /> MHCSD.Demand factors used for this analysts are consistent with the updated and approved 2020 <br /> Potable Water System MasterPlan Update,dated November 2020,and prepared by West-Yost.In <br /> accordance with existing entitlement documents,a 14 percent water conservation reduction in <br /> demand is used.The overall increase to domestic water demand for the proposed project(maximum <br /> daily water demand[MDWDj)is 115r223 gallonsperday(gpd)or 0.115 million gallons per day <br /> (mgd).The 202-0 Potable Water System Master Plan Update identifies a buildout projection to <br /> require a Water Treatment Plant[WTP)expansion to a total of1$.2 mgd.However,as identified in <br /> Section 12.6 of Specific Plan II,the WTP will ultimately be expanded to 2-0 mgd[Carlson,Barbee& <br /> Mountain House MasterPlan and Specific Man Ll April 2022 <br /> a <br /> Amendments and Revisions topprovedactions pu6'ic6rah ICF IOUB13 <br /> Initial Stu*Mitigated Negative Declaration 2-g <br /> 2 X43 58701.1 <br /> Resolution Template 01/2017 <br />