Laserfiche WebLink
Crt l6 2003 5: 32P1! A DEPARTMENT OF TRANSPORTATION iJo 1685 F 3 <br /> ! 8tltiyN),eti 'funNtil'OKl'n IIQM nNfR!)!LSt1dC:A(7ENCY GRAY DAVIS_Gwcmm <br /> STATE Or�t11.11=48111\-- - - .. <br /> DEPAWFMENT OF TRANSPORTATION <br /> b <br /> P.O.BOX 2048(1976 E.CHARTER WAY) <br /> STOCKTON,CA 75201 <br /> TT-Y:Culifuriuli RtIny Strvkt (804)735-2979 <br /> ,P[IONV (209)947-7921 Fluvourpowrr! <br /> FAX (209)948-7194 Ile enemy ryiritnlf <br /> September 29, 2003 <br /> 10-SJ-I-S PM 22.335 <br /> File#PA-02-00631 (Su) <br /> Neg. Dec./Major Subdivision <br /> Noceti Garden Farms [Estates] <br /> Jennifer Jolley <br /> San Joaquin County <br /> Community Development Department <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> Dear Ms. Jolley: <br /> Thank you for the opportunity to comment on the Site Plan for a Major Subdivision <br /> application consisting of 27 single family residential lots plus a s#arm water retention <br /> pond on 6.5 acres located adjacent to Interstate 5 at 3685 S. Turnpike Road <br /> Stockton. We bavc distributed this referral to our various functional units and their <br /> comments are as follows: <br /> Traffic operations <br /> Please collect impact fees for future improvements at the Interchange of 1-5 and <br /> Downing Avenue. <br /> Hydraulics <br /> The developer needs to ensure that the existing State drainage facilities will not be <br /> significantly impacted by the project. if historical undeveloped topography shows <br /> drainage frow,this site flowed into the State Right-of-Way, it may continue to do so <br /> with the conditions that peals flows may not be increased from the pre-construction <br /> quantity and the site run-off be treated to meet present storm water quality standards. <br /> If historical undeveloped topography shows drainage from this site diel not flow into <br /> the State Right-of-Way, then it will not be allowed to flow into the Statc Right-of- <br /> Way at this time. A complete on-site drainage and grading plans need to he submitted <br /> along with all the existing highway drainage system shown an the plans within the <br />