My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004527 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
12400
>
2600 - Land Use Program
>
PA-0400358
>
SU0004527 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:51 AM
Creation date
9/6/2019 10:39:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004527
PE
2622
FACILITY_NAME
PA-0400358
STREET_NUMBER
12400
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
APN
06325002
ENTERED_DATE
7/6/2004 12:00:00 AM
SITE_LOCATION
12400 E KETTLEMAN LN
RECEIVED_DATE
6/30/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\12400\PA-0400358\SU0004527\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 1, 2005 <br /> NOA Project Number:E05067A <br /> Page 2 <br /> during the 4-hour test period. Measurements were made every 30 minutes for a four(4) hour <br /> period. The pre-saturation of the test hole was performed on July 31, 2005. The percolation test <br /> was performed on Monday August 1, 2005. <br /> Table 1. <br /> Summa of the Percolation Test <br /> m:7- Fail <br /> Date Boring Depth Duration * Result <br /> 7-29-05 23.25 feet 4 hours 125 min/inch <br /> 'Acceptable percolation rate is less than or equal to 60 min/in during the last measurement for a shallow test between <br /> 3 and 3.5 feet. Acceptable percolation rate is less than or equal to 30min/in during the last measurement for a deep <br /> test between 3.5 and 25 feet. <br /> The deep percolation test hole did not achieve a satisfactory percolation rate and does not meet <br /> .� the requirements established by the San Joaquin County, Public Health Services, Environmental <br /> Health Division. <br /> �- The next step would be to contact Dillon and Murphy Engineers to discuss other options which <br /> may satisfy EHD requirements for your project. <br /> Our professional services were performed, our findings obtained,and our recommendations <br /> proposed in accordance with generally accepted engineering principles and practices. This <br /> warranty is in lieu of all other warranties either expressed or implied. Test findings and <br /> ` statements of professional opinion do not constitute a guarantee or warranty, expressed or <br /> implied. The invoice with be mailed promptly. If you have any questions,please do not hesitate <br /> ` to call. <br /> Best Regards, <br /> NEIL O. ANDERSON & ASSOCIATES, INC. <br /> � <br /> Nanby Rosulek, A, Project Manager _ j j ' VV� <br /> 1�^' CIPNc; �T,1 <br /> ` 1u CERNFIEL <br /> tNGINEERIN Y ''I <br /> V<J) ,En+_CGST <br /> rd elch, M.Sc., Senior Geologist n� <br /> CEG-2151, CHG-653 `r CF_•_`_= <br />
The URL can be used to link to this page
Your browser does not support the video tag.