Laserfiche WebLink
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> periods. Both the Bird Road/Blewett Road and Koster Road/Blewett Road <br /> intersections are currently operating at a peak hour LOS "A." <br /> Table 3.L-2. Existing Intersection Operations <br /> AM Peak Hour PM Peak Hour <br /> Intersection Delay(sec) LOS Delay(sec) LOS <br /> Bird Road/SR 132 309.7 F 285.2 F <br /> Bird Road/Blewett Road 8.6 A 8.7 A <br /> Koster Road/Blewett Road 9.2 A 9.1 A <br /> Source: Omni-Means 2005. <br /> I-5/SR 132 Ramp Junctions <br /> Table 3.L-3 presents the existing ramp merge/diverge operations for the <br /> southbound I-5 to westbound SR 132 merge and the eastbound SR 132 to <br /> southbound I-5 diverge. Only these two ramps were analyzed as they had the <br /> most direct relationship to the operations at the proposed SR 132/Bird Road <br /> interchange. As shown in Table 3.L-3,both ramps merge and diverge are <br /> operating at acceptable LOS`B"or better during both the AM and PM peak <br /> hours. <br /> Table 3.L-3. Existing 1-5/SR 132 Ramp Junction Operations <br /> I-5/Route 132 Study Interchange Junction AM Peak Hour PM Peak Hour <br /> ' Ramps Type Density LOS Density LOS <br /> SB I-5/WB SR 132 Direct Merge 18.7 B 5.3 A <br /> �. EB SR 132/SB 1-5 Direct Diverge 1.7 A 17.1 B <br /> Source: Omni-Means 2005. <br /> Roadway Segments <br /> Table 3.L-4 presents the current roadway segment traffic operations. SR 132 <br /> from Bird Road to the end of the four-lane freeway segment east of the I-5/SR <br /> 132 interchange currently operates at LOS"A/B"while the two-lane highway <br /> segments on SR 132 to the west of Bird Road and further east of the I-5/SR 132 <br /> interchange currently operates at LOS "F"during the AM and PM peak hours. <br /> As also shown in Table 3.L4,all three non-state highway facilities (Bird Road, <br /> Koster Road and Blewett Road)currently operate at LOS "A"during both the <br /> AM and PM peak hours(Omni-Means 2005). <br /> i. <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 31-5 <br /> JSS 05105 05 <br />