Laserfiche WebLink
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic -" <br /> 2005). Calculated with this factor, Table 3.L-6 shows that 1,254 truck loads <br /> would be produced on a peak production day resulting in 2,508 two-way truck <br /> trips per day. <br /> Table 3.L-6. Vernalis Area Aggregate Production Sites Year 2007 Baseline Peak Daily Truck Trip <br /> Generation <br /> Average Yearly Average Daily Truck Peak Daily Peak Daily Peak Daily Two- <br /> Production(tons) Loads(25 tons/truck) Adjustment Factor Truck Loads Way Truck Trips <br /> 5,600,000 896 1.4 1,254 2,508 <br /> Source: Omni-Means 2005. <br /> Truck loading frequency on an hourly basis was estimated by reviewing current <br /> hourly truck count information collected in May 2004 on Bird Road south of SR <br /> 132 and on recent information provided by individual quarry operators. Truck <br /> loading frequency information provided by individual quarry operators - <br /> represented their best estimate of what their individual loading frequency would <br /> be by hour of a typical day(Omni-Means 2005). The estimated year 2007 daily <br /> truck loading frequencies are shown in Table 3.L-7. The AM and PM peak hours - <br /> (bolded in table)would have 250 and 60 two-way truck trips respectively that <br /> would be entering and exiting SR 132. <br /> Table 3.L-7. Vernalis Area Aggregate Production Sites Year 2007 Baseline Hourly Truck Loading <br /> Frequencies and Estimated Hourly Truck Generation <br /> Total Peak Daily Two-Way Truck Trips: 2,508 <br /> %of Total %of Total <br /> AM Period Hourly Truck Trips Daily Trips PM Period Hourly Truck Trips Daily Trips <br /> 12:00-1:00 7 0.3% 12:00-1:00 194 7.7% <br /> 1:00-2:00 6 0.2% 1:00-2:00 203 8.1% <br /> 2:00-3:00 6 0.2% 2:00-3:00 162 6.5% _ <br /> 3:00-4:00 20 0.8% 3:00-4:00 108 4.3% <br /> 4:00-5:00 61 2.4% 4:00-5:00 60 23% <br /> 5:00-6:00 153 6.1% 5:00-6:00 26 1.0% <br /> 6:00-7:00 250 10.0% 6:00-7:00 23 0.9% <br /> 7:00-8:00 252 10.00/0 7:00-8:00 23 0.9% <br /> 8:00-900 242 9.7% 8:00-900 20 0.8% <br /> 9:00-10:00 229 9.1% 9:00-10:00 11 0.4% <br /> 10:00-11:00 236 9.4% 10:00-11:00 12 0.5% <br /> 11:00-12:00 195 7.8% 11:00-12:00 10 0.4% <br /> Source: Omni-Means 2005. <br /> Table 3.L-8 shows the projected year 2007 baseline study area truck trip <br /> distribution percentages. As shown in Table 3.L-8,approximately 45%of all <br /> aggregate trucks will initially be bound to/from the west on SR 132 from Bird <br /> Road and approximately 55%to the east. - <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 3.L-8 <br /> Jas OW5,os <br />