My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> SR 132/Bird Road Ramp Junction <br /> Table 3.L-11 presents the projected Bird Road on-ramp merge with westbound <br /> SR 132 and eastbound SR 132 off-ramp diverge to Bird Road for the worst-case <br /> design alternative. Both ramp junctions were projected to operate at LOS"C"or <br /> better during both the AM and PM peak hours. <br /> Table 3.1-41. SR 132/Bird Road Interchange Ramp Junction Operations Year <br /> 2007 Base Conditions' LOS with Four-Lane Freeway (Worst-Case Alternative) <br /> AM Peak Hour PM Peak Hour <br /> SR 132/Bird Road Ramps Density LOS Density LOS <br /> Westbound on from Bird Road 17.2 B 1.8 A <br /> ` Eastbound off to Bird Road 5.2 A 21.3 C <br /> Source: Omni-Means 2005. <br /> r <br /> Roadway Segments <br /> With the SR 132/Bird Road interchange project, SR 132 is proposed to be a four- <br /> lane freeway through the Bird Road interchange and immediately to the east and <br /> ` west of the interchange. Table 3.L-12 presents the projected peak hour levels of <br /> service on these SR 132 study segments. <br /> r <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 3.1--11 <br /> J8S 05105.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.