My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Environmental Setting, Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Table 3.L-37. DeSilva Gates Quarry Year 2027 Average Daily Truck Trip <br /> Generation <br /> Average Average Average Average <br /> Yearly Daily Daily Truck Daily Two- <br /> Average Yearly Production Production Production Loads(25 Way Truck <br /> (tons) Days (tons) tons/truck) Trips — <br /> 2027 Baseline: <br /> 15,550,000 250 62,200 2,488 4,976 <br /> Proposed Project(2027): <br /> 800,000 250 3,200 128 256 <br /> 2027 Baseline plus Project: _ <br /> 16,350,000 250 65,400 2,616 5,232 <br /> Source: Omni-Means 2005. <br /> Using the peak adjustment factor of 1.4(40%increase)to reflect the one or more <br /> peak production months that occurs on a yearly basis, the resulting estimated <br /> peak daily truck generation is shown in Table 3.L-38. On a peak production day, <br /> a conservative estimate for traffic impacts,Table 3.L-38 shows that the proposed <br /> Project will generate 358 truck trips per day in 2027. <br /> Table 3.L-38. DeSilva Gates Quarry Year 2027 Peak Daily Truck Trip — <br /> Generation <br /> Average Daily Peak Daily Peak Daily Peak Daily <br /> Average Yearly Truck Loads Adjustment Truck Two-Way <br /> Production(tons) (25 tons/truck) Factor Loads Truck Trips <br /> 2027 Baseline: — <br /> 15,550,000 2,488 1.4 3,483 6,966 <br /> Proposed Project(2027): <br /> 800,000 128 1.4 179 358 — <br /> 2027 Baseline plus <br /> Project: <br /> 16,350,000 2,616 1.4 3,662 7,324 — <br /> Source: Omni-Means 2005. <br /> Year 2027 Plus Project Traffic Volumes — <br /> Table 3.L-39,below,presents the estimated year 2027 plus project truck loading <br /> frequencies. The number of peak daily two-way truck trips that would be <br /> generated by hour was estimated based on the 7,324 two-way truck trips shown <br /> in Table 3.L-38, above. During the AM and PM peak hours,there would be an <br /> increase in two-way truck trips of 33 trips and four trips,respectively. <br /> DeSilva Gates Quarry Project — <br /> Draft Environmental Impact Report 31-32 <br /> J&s 05105 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.