My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Table 3.L-39. Year 2027 Plus Project Hourly Truck Loading Frequencies and Estimated Hourly Truck <br /> Generation <br /> Total Peak Year 2027 Daily Two-Way Truck Trips: 7,324 <br /> %of Total %of Total <br /> V AM Period Hourly Truck Trips Daily Trips PM Period Hourly Truck Trips Daily Trips <br /> 12:00-1:00 20 0.3% 12:00-1:00 566 7.7% <br /> 1:00-2:00 18 0.2% 1:00-2:00 592 8.1% <br /> V 2:00-3:00 18 0.2% 2:00-3:00 474 6.5% <br /> 3:00-1:00 58 0.8% 3:00-4:00 318 4.3% <br /> 4:00-5:00 178 2.4% 4:00-5:00 172 2.3% <br /> bw 5:00-6:00 448 6.1% 5:00-6:00 76 1.0% <br /> 6:00-7:00 730 10.0% 6:00-7:00 66 0.9% <br /> 7:00-8:00 736 10.00/0 7:00-8:00 66 0.9% <br /> • 8:00-9:00 708 9.7% 8:00-9:00 58 0.8% <br /> 9:00-10:00 668 9.1% 9:00-10:00 32 0.4% <br /> 10:00-11:00 688 9.4% 10:00-11:00 36 0.5% <br /> L <br /> 11:00-12:00 570 7.8% 11:00-12:00 28 0.4% <br /> Source: Omni-Means 2005. <br /> Study area truck trip distribution percentages for 2027 plus project are the same <br /> as those for 2027 baseline,shown in Table 3.L-39 above. The year 2027 plus <br /> Project AM and PM peak hour traffic volumes for each interchange alternative <br /> ` are shown in Appendix F,Figure 16. Year 2027 daily traffic volumes are shown <br /> in Appendix F,Figure 17. <br /> 2027 Conditions With Project <br /> Project conditions for 2027 represent the 2027 baseline conditions, including the <br /> SR 132/Bird Road interchange and roadway improvements,plus the <br /> transportation system changes and traffic volume increase from the proposed <br /> Project. <br /> Year 2027 Plus Project Traffic Operations <br /> .. Intersections. Table 3.L-40 compares the projected year 2027 baseline <br /> intersection operations and the 2027 baseline plus project operations for the <br /> worst-case SR 132/Bird Road interchange alternative.As shown,the SR 132 <br /> ramp intersections with Bird Road are projected to operate at LOS D or better <br /> during both the AM and PM peak hours(Omni-Means 2005). <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 31-33 <br /> ASD5105.05 <br /> VM <br />
The URL can be used to link to this page
Your browser does not support the video tag.