Laserfiche WebLink
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Table 3.L-39. Year 2027 Plus Project Hourly Truck Loading Frequencies and Estimated Hourly Truck <br /> Generation <br /> Total Peak Year 2027 Daily Two-Way Truck Trips: 7,324 <br /> %of Total %of Total <br /> V AM Period Hourly Truck Trips Daily Trips PM Period Hourly Truck Trips Daily Trips <br /> 12:00-1:00 20 0.3% 12:00-1:00 566 7.7% <br /> 1:00-2:00 18 0.2% 1:00-2:00 592 8.1% <br /> V 2:00-3:00 18 0.2% 2:00-3:00 474 6.5% <br /> 3:00-1:00 58 0.8% 3:00-4:00 318 4.3% <br /> 4:00-5:00 178 2.4% 4:00-5:00 172 2.3% <br /> bw 5:00-6:00 448 6.1% 5:00-6:00 76 1.0% <br /> 6:00-7:00 730 10.0% 6:00-7:00 66 0.9% <br /> 7:00-8:00 736 10.00/0 7:00-8:00 66 0.9% <br /> • 8:00-9:00 708 9.7% 8:00-9:00 58 0.8% <br /> 9:00-10:00 668 9.1% 9:00-10:00 32 0.4% <br /> 10:00-11:00 688 9.4% 10:00-11:00 36 0.5% <br /> L <br /> 11:00-12:00 570 7.8% 11:00-12:00 28 0.4% <br /> Source: Omni-Means 2005. <br /> Study area truck trip distribution percentages for 2027 plus project are the same <br /> as those for 2027 baseline,shown in Table 3.L-39 above. The year 2027 plus <br /> Project AM and PM peak hour traffic volumes for each interchange alternative <br /> ` are shown in Appendix F,Figure 16. Year 2027 daily traffic volumes are shown <br /> in Appendix F,Figure 17. <br /> 2027 Conditions With Project <br /> Project conditions for 2027 represent the 2027 baseline conditions, including the <br /> SR 132/Bird Road interchange and roadway improvements,plus the <br /> transportation system changes and traffic volume increase from the proposed <br /> Project. <br /> Year 2027 Plus Project Traffic Operations <br /> .. Intersections. Table 3.L-40 compares the projected year 2027 baseline <br /> intersection operations and the 2027 baseline plus project operations for the <br /> worst-case SR 132/Bird Road interchange alternative.As shown,the SR 132 <br /> ramp intersections with Bird Road are projected to operate at LOS D or better <br /> during both the AM and PM peak hours(Omni-Means 2005). <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 31-33 <br /> ASD5105.05 <br /> VM <br />