My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ San Joaquin County Community Alternatives Analysis <br /> Development Department <br /> concrete plant,recycling plant and aggregate handling and storage piles,would <br /> also not occur. Implementation of Mitigation Measure AIR-4a: Restrict Idling of <br /> On-Road Diesel Trucks and Mitigation Measure AIR41b: Implement Emissions <br /> Control Technology would reduce this impact. However,total emissions of <br /> ROG and NOx associated with excavation of the quarry and hauling of materials <br /> would still be in excess of SJVAPCD thresholds. This impact on air quality <br /> would remain significant and unavoidable. <br /> Diesel exposure from vehicles accessing the facility and operation of on-site <br /> ` diesel equipment can create an elevated cancer risk. However, assuming the <br /> closest sensitive receptor would be located more than 300 feet from the access <br /> points and operation areas for such vehicles under this alternative,the cancer risk <br /> �- would be below threshold levels and this impact on air quality could be <br /> mitigated to a less-than-significant level. <br /> Transportation and Traffic <br /> The number of truck trips from the project site would remain the same as the <br /> proposed Project as trucks would be used to haul unprocessed excavated material <br /> off site to the processing plant. Recyclable material would be brought directly to <br /> i the existing off-site plant,reducing inbound truck trips at the project site,but <br /> increasing truck trips to the off-site facility. <br /> This alternative would require additional miles of truck travel to deliver <br /> unprocessed material to the off-site processing plant and then deliver processed <br /> material to the final user. This has the potential to cause significant impacts <br /> attributable to changes in LOS and increased structural roadway damage on <br /> routes required to access the off-site facility. In addition,the changes in LOS on <br /> segments of SR 132 and structural damage that potentially would occur under the <br /> proposed action also would occur under this alternative. Mitigation to reduce the <br /> ` structural roadway damage to less-than-significant levels would be similar to <br /> mitigation proposed for the proposed Project. However,as described in section <br /> 3.L, "Transportation and Traffic,"no mitigation is available to reduce impacts of <br /> changes in LOS on SR 132. This impact on transportation would be <br /> significant and unavoidable. <br /> Mitigated Design Alternative <br /> The impacts of this alternative would be similar to the proposed Project for all <br /> resource areas except aesthetics, air quality,noise, and transportation and traffic, <br /> which are discussed below. <br /> r. <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 4-5 <br /> J85 05105.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.