San Joaquin County Community Other CEQA Considerations <br /> Development Department <br /> accommodate the continued farming of the later stages of the Project concurrent <br /> with mining activities. The existing orchard would not be completely removed at <br /> on-set of the Project; rather, the areas identified as later stages(i.e. excavation <br /> areas)would continue to be farmed while excavation takes place on other areas <br /> of the site. As site operations progress through the proposed Project stages,the <br /> previously mined areas would be reclaimed to support an agricultural uses, as <br /> .. mining operations progress to the next stage. Further,the applicant proposes a <br /> reclamation plan that is designed to support development of agricultural land <br /> uses following the conclusion of mining and reclamation activities at the site. <br /> Construction of new buildings and roadways would involve substantial quantities <br /> of building materials and energy, some of which are nonrenewable. The <br /> proposed quarry operation would increase the local demand for fmite energy <br /> resources, such as electricity,petroleum, and propane. Consumption of such <br /> materials and energy is associated with any resource-extractive project, and these <br /> commitments are not unique or unusual to this Project or region. The proposed <br /> Project would also result in an increase in automobile and truck trips. These <br /> additional trips, plus extraction and processing activities at the site would also <br /> ` require the use of fossil fuels and other nonrenewable resources. <br /> r <br /> r <br /> r <br /> r <br /> r <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 5-17 <br /> JRS 05105.05 <br />