Laserfiche WebLink
TABLE OF CONTENTS <br /> LSECTIONS........................................................................................................................................................... PAGE <br /> INTRODUCTION.........................................................................................................................................................I <br /> �. SETTING......................................................................................................................................................................I <br /> PREVIOUSSTUDIES..................................................................................................................................................I <br /> CIRCULATION NETWORK.......................................................................................................................................5 <br /> L STUDY AREA INTERSECTIONS AND ROADWAY SEGMENTS.........................................................................6 <br /> EXISTING TRAFFIC VOLUMES...............................................................................................................................6 <br /> LEVEL OF SERVICE METHODOLOGY...................................................................................................................7 <br /> L EXISTING CONDITIONS TRAFFIC OPERATIONS..............................................................................................11 <br /> EXISTING CONDITIONS ACCIDENT DATA ANALYSIS...............................................:....................................12 <br /> PROPOSEDPROJECT...............................................................................................................................................14 <br /> YEAR 2007 BASE TRAFFIC VOLUMES.................................................................................................................16 <br /> YEAR 2007 BASE TRAFFIC OPERATIONS...........................................................................................................20 <br /> YEAR 2007 PLUS PROJECT TRAFFIC VOLUMES...............................................................................................24 <br /> YEAR 2007 PLUS PROJECT TRAFFIC OPERATIONS..........................................................................................25 <br /> L YEAR 2027 BASE TRAFFIC VOLUMES.................................................................................................................30 <br /> YEAR 2027 BASE CONDITIONS TRAFFIC OPERATIONS..................................................................................32 <br /> YEAR 2027 PLUS PROJECT TRAFFIC VOLUMES...............................................................................................38 <br /> YEAR 2027 PLUS PROJECT TRAFFIC OPERATIONS..........................................................................................40 <br /> KOSTER ROAD/DESILVA GATES QUARRY ENTRANCE INTERSECTION....................................................45 <br /> ROADWAY TRAFFIC INDEX(TI)VALUES..........................................................................................................46 <br /> ` ROADWAY TYPICAL CROSS SECTIONS.............................................................................................................48 <br /> BRIDGE/STRUCTURE CROSSINGS.......................................................................................................................49 <br /> IMPACTS AND MITIGATION MEASURES...........................................................................................................49 <br /> L <br /> LIST OF FIGURES <br /> LFigure 1 —Project Location Map...................................................................................................................................2 <br /> Figure 2—DeSilva Gates Quarry Mine Development Plan...........................................................................................3 <br /> Figure 3—Vernalis Area Quarry Producers..................................................................................................................4 <br /> r Figure 4—Existing Conditions Study Area Peak Hour Traffic Volumes......................................................................8 <br /> Figure 5—Existing Conditions Daily Traffic Volumes.................................................................................................9 <br /> Figure 6—Year 2007 Base Study Area Peak Hour Traffic Volumes..........................................................................18 <br /> Figure 7—Year 2007 Base Daily Traffic Volumes.....................................................................................................19 <br /> Figure 8—Year 2007 Base Study Area Peak Hour Traffic Volumes:Interchange Design Alternatives.....................21 <br /> Figure 9—Design Alternative 1 Through Alternative 3 Recommended Intersection Geometrics&Control.............22 <br /> Figure 10—Year 2007 Plus Project Study Area Peak Hour Traffic Volumes.............................................................26 <br /> Figure I1 —Year 2007 Plus Project Daily Traffic Volumes........................................................................................27 <br /> Figure 12—Year 2007 Plus Project Study Area Peak Hour Traffic Volumes:Interchange Design Alternatives.......28 <br /> Figure 13—Year 2027 Base Conditions Study Area Peak Hour Traffic Volumes......................................................33 <br /> .. Figure 14—Year 2027 Base Conditions Daily Traffic Volumes.................................................................................34 <br /> Figure 15—Year 2027 Base Conditions Study Area Peak Hour Traffic Volumes:Interchange Design <br /> Alternatives................................................................................................................................................35 <br /> r. Figure 16—Year 2027 Plus Project Study Area Peak Hour Traffic Volumes.............................................................41 <br /> Figure 17—Year 2027 Plus Project Daily Traffic Volumes........................................................................................42 <br /> Figure 18—Year 2027 Plus Project Study Area Peak Hour Traffic Volumes:Interchange Design Alternatives.......43 <br /> L <br /> Draft DeSilva Gates Quarry Traffic&Circulation Analysis i August 2005 <br /> Jones&Stakes (R905TIS001/25-4000-02) <br />