Laserfiche WebLink
Table 32 SR-132/Bird Road Interchange Ramp Junction Operations Year 2027 Base Conditions Levels Of <br /> Service(LOS)with 4-Lane Freeway(Alternatives 1 through 3)................................................................37 <br /> Table 33 Year 2027 Base Conditions Roadway Segment Levels Of Service(LOS)with Proposed SR-132/Bird <br /> Road Interchange(Alternatives 1 Through 3)............................................................................................38 <br /> r. Table 34 Vernalis Aggregate Production Sites Year 2027 Plus Project Average Yearly Production(TONS)...........38 <br /> Table 35 Vernalis Aggregate Production Sites Year 2027 Plus Project Average Daily Truck Trip Generation........38 <br /> Table 36 Vernalis Aggregate Production Sites Year 2027 Plus Project Peak Daily Truck Trip Generation..............39 <br /> Table 37 Vernalis Aggregate Production Sites Year 2027 Plus Project Hourly Truck Loading Frequencies and <br /> Estimated Hourly Truck Generation...........................................................................................................39 <br /> Table 38 Year 2027 Plus Project Aggregate Truck Trip Distribution........................................................................40 <br /> Table 39 Year 2027 Plus Project Peak Hour Intersection Operations with Proposed SR-132/Bird Road <br /> L Interchange(Alternatives I through 3).......................................................................................................40 <br /> Table 40 SR-132 Between I-5/Brd Road Interchanges Weaving Operations Year 2027 Plus Project Levels Of <br /> Service(LOS)with 4-Lane Freeway with SR-132/Bird Road Interchange(Alternatives 1 Through 3)....44 <br /> t. Table 41 I-5/SR-132 Interchange Weaving Sections Analysis Year 2027 Plus Project Levels Of Service(LOS)....44 <br /> Table 42 SR-132/Bird Road Interchange Ramp Junction Operations Year 2027 Plus Project Levels Of Service <br /> (LOS)with 4-Lane Freeway(Alternatives 1 Through 3)...........................................................................45 <br /> in. Table 43 Year 2027 Plus Project Roadway Segment Levels Of Service(LOS)with Proposed SR-132/Bird Road <br /> Interchange(Alternatives 1 Through 3).....................................................................................................45 <br /> Table 44 Estimated Roadway Traffic Index(Tl)Values Two-Way Traffic................................................................47 <br /> Table 45 Roadway Traffic Index(TI)Values Estimated Increase Resulting from Proposed Project Two-Way <br /> imTraffic.........................................................................................................................................................47 <br /> Table 46 Estimated Roadway Traffic Index(TI)Values by Direction of Travel........................................................48 <br /> Table 47 Roadway Traffic Index(TI)Values Estimated Increase Resulting from Proposed Project by Direction <br /> LOf Travel....................................................................................................................................................48 <br /> L <br /> L <br /> i <br /> i <br /> 2nd Draft DeSilva Gates Quarry Traffic&Circulation Analysis iii October 2005 <br /> Jones&Stokes (R905TIS002/15-4000.02) <br /> i. <br />