My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intersection Operations: Table 29 presents the projected year 2027 base conditions intersection <br /> operations for all three design alternatives. As shown in Table 29, the SR-132 ramp intersections with _ <br /> Bird Road are projected to operate at LOS "C"or better during both the AM and PM peak hours under all <br /> three design alternatives. As also shown in Table 29, Blewett Road intersections with Bird Road and <br /> Koster Road are projected to operate at LOS`B"or better during both peak hour periods. <br /> TABLE 29 <br /> YEAR 2027 BASE CONDITIONS PEAK HOUR INTERSECTION OPERATIONS <br /> WITH PROPOSED SR-132BIRD ROAD INTERCHANGE(ALTERNATIVES 1 THROUGH 3) <br /> Alternative I Alternative 2 Alternative 3 <br /> AM Peak PM Peak AM Peak PM Peak AM Peak I'M Peak <br /> Hour flour (lour Hour Hour Hour <br /> Delay LOS I Delay I LOS Delay LOS Delay LOS Delay LOS Delay LOS <br /> WB 1321 Bird Road 24.5 C 11.4 B 11.3 B 10.1 B 11.3 B 10.1 B <br /> Ram s' <br /> EB 1321 Bird Road 13.6 B 10.7 B 13.7 B 11.3 B 13.6 B 10.7 B <br /> Ram s' <br /> Bird Rd./ 13.7 B 11.4 B 13.7 B 11.4 B 13.7 B 11.4 B <br /> Blewett Rd.* <br /> Koster Rd./ ILA B 9.4 A 11.4 B 9.4 A 11.4 B 9.4 A <br /> BlewettRd.' <br /> '-Intersections evaluated as Two Way Stop Control Intersections with stop-signs on minor road approaches <br /> LOS—Minor Street Approach Level of Service for Two-way-stop-controlled intersections <br /> Freeway Weaving Segment Operations: Table 30 presents the projected weaving operation between the <br /> I-5/SR-132 and SR-132/Bird Road interchanges. The first segment(referred to as Location 1 in Table 30) <br /> is the weave on westbound SR-132 between the southbound I-5 direct off ramp to westbound SR-132 and <br /> the westbound SR-132 off ramp to Bird Road. The second segment(referred to as Location 2 in Table 30) <br /> is the weave on eastbound SR-132 between the Bird Road on ramp and the eastbound SR-132 direct off — <br /> ramp to southbound I-5. As shown in Table 30, all design alternatives weave sections are projected to <br /> operate at LOS "D" on westbound SR-132 during the AM peak hour and LOS "D"on eastbound SR-132 <br /> during the PM peak hour. — <br /> TABLE30 <br /> SR-132 BETWEEN I-5/BIRD ROAD INTERCHANGES WEAVING OPERATIONS <br /> YEAR 2027 BASE CONDITIONS LEVELS OF SERVICE(LOS)WITH 4-LANE FREEWAY <br /> WITH PROPOSED SR-132/BIRD ROAD INTERCHANGE(ALTERNATIVES I THROUGH 3) <br /> AM Peak Hour PM Peak Hour <br /> Number of Basic Number of Basic <br /> Weaving Lanes(NB)in Number of Lanes(N) LOS Lanes(NB)in Number of Lanes(N) LOS <br /> Segment WeavingSection in Weaving Section Weavin Section in Weaving Section - <br /> Location 1 2 3 D ? 3 A <br /> Location 2 2 3 A D <br /> Leisch Method(HDM Figure 504.7A) <br /> Weaving section calculations under year 2027 base conditions were also evaluated within the I-5/Route <br /> 132 freeway-to-freeway interchange. Table 31 shows the projected weaving operations within this <br /> interchange. The fust segment(referred to as Location 1)is the weave on westbound SR-132 between the _ <br /> northbound I-5 loop off ramp and the loop on ramp to southbound I-5; the second segment(referred to as <br /> Location 2) is weave on eastbound SR-132 between the southbound I-5 loop off ramp and the loop on <br /> ramp to northbound I-5; the third segment (referred to as Location 3) is the weave on northbound 1-5 <br /> between the eastbound SR-132 loop on ramp and the loop off ramp to westbound SR-132; and the fourth <br /> segment (referred to as Location 4) is the weave on southbound I-5 between westbound SR-132 loop on <br /> 2nd Draft DeSilva Gates Quarry Trafc&Circulation Analysis 36 October 2005 <br /> Jones&Stokes (R905TIS002/25-4000-02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.