Laserfiche WebLink
project's entrance south to Blewett Road and on Bird Road north of Blewett Road by 0.5 respectively. <br /> This is considered a less-than significant impact with mitigation. <br /> Mitigation Measure S <br /> To mitigate the year 2027 plus project condition would require adding an AC lift on Koster Road from <br /> the project's entrance south to Blewett Road and an AC lift on Bird Road north of Blewett Road <br /> sufficient to accommodate the projected increase in structural section required by the increase in T.I. — <br /> values over year 2007 base conditions. <br /> Level of Significance After Mitigation: Less-Than-Significant _ <br /> 2"Draft DeSilva Gates Quarry Trafc&Circulation Analysis 54 October 2005 <br /> Jones&Stokes (8905775002 125-4000-02) <br />