My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul ,12. 2006 3:51PM CA DEPARTMENT OF TRANSPORTATION No 6443 P. 4 <br /> Mr. Martin <br /> July 5, 2006 <br /> Page 3 <br /> 14. Volume 1, truck percentage and weaving speed use in the Weaving analysis are E_15 <br /> incorrect. This must be corrected and resubmitted. <br /> 15. Provide the weaving analysis 2025 for Interstate 5(1-5) N11, 1-5 SB Ilaul Route 2, E-16 <br /> SR-132 WB Haul Route 1. <br /> 16. The cumulative projection year must be clarified. By comparing Figure 13 <br /> "Existing Traffic Volumes"to Figure 17 "Cumulative without Project Traff a E-17 <br /> Volumes", there is little change in the traffic volume. The reason must be <br /> clarified. <br /> 17. A provide Synchro 6 Report must be provided for the Existing and Cumulative E-18 <br /> without Project conditions at the SR-132/Koster Road intersection. <br /> 18. Haul Routes 2 and 3, need to include a signal warrant study and a left-turn <br /> warrant at the following intersections and resubmitted: E_19 <br /> • SR-132/Koster Road, and <br /> • SR-33fWelty Road. <br /> 19. Roadway Segment Level Service Analysis input/output data for all scenarios must E-20 <br /> be provided. <br /> 20. .Tr4tUcORcrationsrecomme.ndslJ,aiiI Route 1. Haul Route 1 is consistent with the <br /> Project Study Report for SR-132/Bud Rd interchange(EA 2A780K). The proposed <br /> E-21 <br /> project applicant is required to contribute it's fair share of thr, cost of the interchange <br /> and future pavement upgrades along SR-132, 1-5 and 1-5/SR- 132 and Tnterstate 580 (1- <br /> 580)/SR-132 interchanges. <br /> 21. Haul Routes 2 and 3 shall not be allowed.Thmr Haul Routes would increase traffic <br /> safety hazard at the intersections of SR-132/Koster Rd and State Route 33 (SR- <br /> 33)/Weity Ave. It should be noted the Project Study Rcport for SR-132/Bird Rd E-22 <br /> interchange (EA 2A780K) was approved by the Department with the condition from <br /> San Joaquin County prohibiting trucks from using Koster Road for access. All truck <br /> access to and from SR-132 is limited to Bird Rd interchange. <br /> 'C41W,iJ impro,W�bllhy.r a rxW,,mla" <br />
The URL can be used to link to this page
Your browser does not support the video tag.