4.Minor Revisions to the Draft Environmental Impact Report
<br /> silt pond. Mining would continue to Phase II, III, IV,and so on until all phases have been mined.
<br /> Once mining is eeflipleted in the Phase IV area,the pit would be used as a permanefft4k-pend
<br /> �.
<br /> .d....g with the silt pond in the Phase 1 area. If additional silt storage is needed during the course
<br /> of mining,the Phase V IV area would be used as a silt pond. Phase IX VIII will be mined once
<br /> the structures including the aggregate plant are demolished and removed. The material excavated
<br /> from Phase I-X VIII will be processed by a portable plant located on the capped settling pond in
<br /> `, the Phase IV I area. Tables 3-1 and 3-2 describe the elements of the mine phases.
<br /> REVISED TABLE 3-1
<br /> PROPOSED PROJECT FEATURES AND CHARACTERISTICS
<br /> r
<br /> Volume of Maximum
<br /> Total Pit Volume of Volume of Material Depth of
<br /> Mining Volume Overburden Top Soil Extracted' Extraction
<br /> Operation Acres (Cubic Yards) (Cubic Yards) (Cubic Yards) (Cubic Yards) (Feet)
<br /> Phase 1 112.7 13,967,000 1,136,391 136,367 8,319,621 94
<br /> Phase II 84.8 11,882,000 855,067 102,608 10,924,325 92
<br /> Phase III 73.4 11,385,000 740,117 88,814 10,556,069 105
<br /> Phase IV 83.1 15,869,000 837,925 100,551 14,930,524 116
<br /> Phase V 111.5 20,796,000 1,124,292 134,915 19,536,793 105
<br /> Phase VI 77.6 11,120,000 782,467 93,896 10,243,637 105
<br /> Phase VII 77.6 10,035,000 782,467 93,896 9,158,637 98
<br /> Phase VIII 38 5,132,000 383,167 45,980 4,702,853 88
<br /> ` Total 659 100,189,000 6,644,917 797,390 92,746,693
<br /> L ' Material Extracted equals total ph volume less overburden and topsoil
<br /> SOURCE: Spinardi Associates,2004.
<br /> C
<br /> REVISED TABLE 3-2
<br /> PROPOSED PROJECT MINING AND RECLAMATION SCHEDULE
<br /> Mining Product Years to Mine Years to Mine Range of Years Range of Years
<br /> Operation (Tons) (1.7 mtns/yr) (4.0 mtns/yr) to Mine to Reclaim
<br /> Phase 1 14,052,900 8 3 0 to 8 59 to 60
<br /> L Phase II 11,006,000 6 3 3 to 14 6 to 17
<br /> Phase 111 11,814,000 7 3 6 to 21 9 to 23
<br /> Phase IV 16,759,000 10 4 9 to 32 15 to 33
<br /> Phase V 21,769,000 13 5 13 to 45 18 to 46
<br /> Phase VI 8,605,000 5 2 21 to 54 23 to 57
<br /> Phase VIII 5,086,000 3 1 23 to 59 24 to 60
<br /> Total 99,477,900 59 25 25 to 59
<br /> SOURCE: Reclamation Plan,RMC Pack Materials,Inc.Vernalis Quarry,October 2003
<br /> �rr
<br /> 1101
<br /> ` Cemex Vernalk Quarry Mining and Reclamation Project 4-11 ESA/203015
<br /> Finai Environmental Impact Repoli June 2008