Laserfiche WebLink
Cemex Vernalis Quarry Mining and Reclamation Project <br /> 3.6.3 Processing Facility <br /> Water <br /> It is estimated that overall project operations would require approximately 3,840,000 gallons of <br /> water per day (approximately 3,040 acre feet annually)at 1.7 mty. The volume of water required <br /> for dust suppression would be approximately 80,000 gpd during dry months; landscaping would _ <br /> require approximately 8 acre feet per year for approximately 17 acres of land;and water demand <br /> for the Ready Mix Plant would be approximately 25,000 gpd. <br /> The Applicant would use well water and recycled water from silt ponds for water supply.Well <br /> water would be used exclusively until silt ponds are established. Once the silt ponds are <br /> established,the Applicant would recycle the decanted waters from the silt pond for use in — <br /> washing the sand and gravel; however it is anticipated that approximately 25 percent of the <br /> project's water requirement would be supplied from the well water. <br /> A temporary silt pond would be built in the Phase IVR VII area by stripping the overburden from <br /> the Phase I area and creating a basin.The applicant would use well water at the rate of <br /> approximately 3.8 mgd to 8.9 mgd(based on a production range of 1.7 mty to 4.0 mty) until there — <br /> is enough wastewater to be recycled in the temporary silt pond. Once water recycling begins,the <br /> applicant would only need to replenish the amount of water lost to evaporation and/or sold in the <br /> product. Once the silt pond is established,it is anticipated that only 0.28 mgd to 0.4 mgd of water <br /> supply would be supplied by well water. The volume of water needed for replenishment is <br /> provided below. — <br /> • Evaporation loss: The temporary silt pond in the Phase WB VII area would measure <br /> 40 acres. Therefore,evaporation for the year(at 6 feet per year)would be 78.2 <br /> million gallons annually (240 acre-feet),or 214,200 gallons daily. — <br /> • Production loss: Assuming seven percent loss in the product(i.e.,products will have <br /> an average of 7 percent moisture when they leave the project site)at a production rate — <br /> of 1.7 million tons per year,product loss would be approximately 210 million pounds <br /> of water annually,or 68,500 gallons of water daily. <br /> • Total loss: By adding the evaporation and product losses the total water loss would <br /> be 282,700 gpd with a production rate of 1.7 million tons per year.With a production <br /> rate of 4.0 million tons per year,the total loss would be 396,800 gallons of water <br /> daily. — <br /> 3.6.4 Reclamation <br /> The Applicant and its consultants have prepared a reclamation plan for the RMC Pacific (Now <br /> Cemex)Vernalis Quarry, dated OntebeF November 2003, pursuant to the requirements of the _ <br /> Surface Mining and Reclamation Act(SMARA)and the County's mining ordinance. <br /> Cemex Vernal¢Quarry Mining and Reclamation Project 4-12 ESA 12 15 <br /> Final Emironnental Impact Report June 20ne <br />