Laserfiche WebLink
U r r r r r , r- r- - r--- <br /> 4.Minor Revisions to the Draft Environmental Impact Report <br /> REVISED TABLE 4.4-3 <br /> AM PEAK HOUR ROAD SEGMENT LEVEL OF SERVICE SUMMARY <br /> Near-Term With Project Cumulative With Project <br /> Near-Term Without Cumulative Without <br /> Road Segment Existing Project Haul Route 1 Haul Route 3 Project Haul Route 1 Haul Route 3 <br /> Bird Road: Blewett to SR A A B A B C B <br /> 132 <br /> SR 132:Chrisman to Bird F F F na F F na <br /> SR 132: Bird to 1-5 B B C na D D na <br /> SR 132:1-5 to Koster F F F na F F na <br /> SR 132:Koster to SR 33 F F F na F F na <br /> SR 132:SR 33 to F F F na F F na <br /> McCracken <br /> Blewett:Bird to 1-6 A A A A A A A <br /> Blewett:1-5 to Koster A A A A A A A <br /> Blewett:Koster to Welty A A A A A A A <br /> Welty:Blewett to SR 33 A A A A A A A <br /> Welty:SR 33 to SR 132 A A A na A A na <br /> na:not applicable to this Haul Route <br /> Source:Peters Engineering Group,2008. <br /> Cemex Vernalis Ouany Mining and Reclamation Project 4-25 ESA/203015 <br /> Final Environmental Impact Repoli June 2008 <br />