Cemex Vernalis Quarry Mining and Reclamation Pmject <br /> 4.4.3 Impacts and Mitigation Measures <br /> Significance Criteria <br /> According to CEQA Guidelines,a project would normally have a significant effect on the <br /> environment if it would "cause an increase in traffic which is substantial in relation to the existing <br /> traffic load and capacity of the street system." For the purpose of this EIR, reference is made to _ <br /> the San Joaquin County Guidelines for the Preparation of Traffic Impact Studies,which states <br /> that"all County roadways shall operate at LOS C or better and intersections shall operate at an <br /> overall LOS D or better on minor arterials and roadways of higher classification; and LOS C on <br /> all other roads. All freeways and state highways shall operate at LOS D." <br /> In addition,for the purpose of this EIR,the project would be considered to cause a significant — <br /> impact if project-generated traffic would cause an increase in traffic safety hazards on area <br /> roadways,or deterioration of the physical condition of area roadways and bridges. A small impact <br /> can be considered significant. The threshold for roadway structural sections is usually an increase <br /> in the Traffic Index of between greater than 0.5 and 1.0. <br /> Intersection Analyses <br /> The following scenarios were analyzed for weekday AM peak hour conditions in this analysis, <br /> which typically occurs between 7:00 and 9:00 AM. <br /> • Existing Conditions <br /> 0 Existkt With Seasonal Adjustments <br /> • Cumulative Without Pfeje,.«Near-Term Without Proiect(Existing Conditions plus <br /> Approved Projects) <br /> • Cumulative With Pr Near-Term With Project-Haul Route Option 1 _ <br /> • Cumulative With o. :o t Near-Term With Project-Haul Route Option 2 3 <br /> c..« re Conditions Without Projeet(Year 2025) Cumulative Year 2025 Conditions <br /> Without Proiect <br /> • Futufe Conditions With Project Cumulative Year 2025 Conditions With Project- <br /> Haul Route Option I <br /> . Future Cond-ifien,,exr:a, Projeet Cumulative Year 2025 Conditions With Project- <br /> Haul Route Option-2-3 — <br /> The PM peak hour,which typically occurs between 4:00 and 6:00 PM,was not analyzed because <br /> the project-generated traffic is expected to decrease significantly between approximately 3:00 and — <br /> 4:00 PM,and as described above, 24-hour machine counts conducted for this EIR indicate that <br /> truck traffic originating from the existing mining sites in the project area is negligible during the <br /> PM peak hour of the adjacent roads relative to the AM peak-hour volumes. <br /> Generally-accepted traffic engineering principles and methods were employed to estimate the <br /> amount of traffic expected to be generated by the project and to analyze the traffic conditions <br /> expected to exist in the future. <br /> Cemex Vernals Quarry Mining and Reclamation Project 4-26 ESA 1203615 <br /> Final Environmenbl Impact Report June 2008 <br />