My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Minor Revisions to the Draff Environmental Impact Report <br /> r <br /> The traffic volumes expected to be generated by the approved mining site not yet in operation on <br /> Bird Road south of Blewett Road are shown in Figures 11 and 12 contained in Appendix C. <br /> These approved-project traffic volumes were estimated based on a review of the Environmental <br /> ` Impact Reports for Brown Sand and Gravel (final report dated July 1997, State Clearinghouse <br /> Number 960-42075). <br /> Trip Distribution <br /> Two possible haul routes were considered as part of the analysis. Each of these routes,along with <br /> the associated distribution of trips,is described below and shown on Figures 4.4-2 and 4.4-3. <br /> V <br /> • Haul Route 9ptign:1: All trucks entering and exiting the project site would use <br /> Blewett Road and Bird Road. Ten percent of trucks would travel on SR 132 west of <br /> Bird Road.Ninety percent of trucks access the SR 132/1-5 interchange. Seventy <br /> percent of trucks would travel on 1-5 north of SR 132. Five percent of trucks would <br /> travel on I-5 south of SR 132. Fifteen percent of trucks would travel on SR 132 east <br /> of I-5. <br /> 4 l4aulRetAaOi3tien '2Sim 4 1 ar dislii huti an to Haul Route Option !,with the <br /> option that tmeks will have the entien of using Pester Dryad for assess to and <br /> from CD 131 In this <br /> r se <br /> , 4:s ant:s:hatzed that tntiplrsuleaving the site <br /> eat on S 11Z32 willmakeam5-Ct Yvoter R-ead./CD 122Trucks entering <br /> y ethl:enns <br /> ite... <br /> frem the east may,male left turns at Kn9ter Ragd/CD 1 ZZ Tnysks entering the sit <br /> f,.... 1 5 mill of-SR 432 would likely tray el east on QD 132 and tam Fight t Kesto <br /> Read. Due to difficulties in making left Wms, it is antieipated that few trucks we <br /> leave the site tFaveling nefthbound on Ke846F Road and making a left tum to <br /> esttxv�tbound-SSR-132.. <br /> • Haul Route 3: All trucks entering and exiting the project site use Blewett Road <br /> between Koster Road and Welty Road. All trucks also use Welty Road to provide <br /> access to SR 33. One-hundred percent of trucks travel on SR 33 between 1-5 and SR <br /> 132 the same 100 percent of trucks travel on 1-5 north of SR 33. Haul Route 3 is <br /> designed to eliminate left-tum movements across SR 132 by using the SR 132/SR 33 <br /> interchange.Hauled tonnage will be limited to 1.33 million tons per year(TPY). If <br /> bill, Haul Route 3 is used then the following safety enhancements will be undertaken <br /> including: <br /> o Construction of 4-foot shoulders beyond the outermost truck wheel tracks. <br /> o Reconfiguration of intersection striping to prevent timing trucks from crossing <br /> I over double yellow stripes. <br /> o Installation of signage to warn trucks about blocking the railroad tracks <br /> Consultation with Union Pacific regarding any additional measures needed. <br /> r <br /> o Reconfiguration of traffic stripes and trimming or removal of trees and <br /> vegetation to eliminate horizontal sight distance constraints. <br /> o Construction of acceleration and deceleration lanes at the intersection for tracks <br /> turning right onto southbound Welty and northbound trucks turning left onto <br /> State Route 33. <br /> Cemex Vernalis Quan,Mining and Reclamation Project 4-29 ESA/=15 <br /> Final Environroantal Impact Report June 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.