Laserfiche WebLink
Cemex Vernalis Quarry Mining and Reclamation Project <br /> TAR' IF 4 x AA A <br /> PROJECT TRIP GENERATION <br /> ������T���� Annual Average Peak SeasonalAverage <br /> Daily-Trips <br /> Employee TF PS(Pion Trisioli) 99 go <br /> 4 22s 4;962 <br /> Ranyclad Malliar 21 Truck Trips 6 40 <br /> ` 6 <br /> 419 <br /> Total-TR161Fr..po a-,236 4,982 <br /> Hourly Trips <br /> Average Aggregate TFuGIk Loads(8 hows/day), 77 4223 <br /> Total Peak HeUF T-Fipr(W8 1 018) 492 3306 <br /> REVISED TABLE 4.4-4 <br /> PROJECT TRIP GENERATION <br /> Annual Average Maximum Annual Volumes Peak Volumes <br /> Annual Loads <br /> Production(tons) 2,850,000 4,000,000 4,000,000 <br /> Aggregate Truck Loads(25 tonsRruck) 114,000 160,000 160,000 <br /> Recycling Truck Loads 470 780 780 <br /> Cement Truck Loads 470 780 780 <br /> Annual Trips <br /> Aggregate Truck Trips(Inbound+Outbound) 228,000 160,000 160,000 <br /> Recycled Material Truck Trips 940 1,560 1,560 <br /> Cement Truck Trips(Inbound+Outbound) 940 1,560 1,560 <br /> Total Truck Trips 229,880 323,120 323,120 <br /> Daily Loads(260 days/year) <br /> Aggregate Truck Loads 439 613 981 <br /> Recycling Truck Loads 3 3 5 <br /> Cement Truck Loads 3 3 5 <br /> Daily Trips <br /> Employee Trips(Non-Truck) 80 80 80 <br /> Aggregate Truck Trips(Inbound+Outbound) 878 1,226 1,962 <br /> Recycled Material Truck Trips 6 6 10 <br /> Cement Truck Trips(Inbound+Outbound) 6 6 10 <br /> Total Truck Trips 890 1,238 1,982 <br /> Hourly Trips <br /> Average Aggregate Truck Loads(8 hours/day) 55 77 123 <br /> Peak-Hour Truck Loads(1.25 x average) 69 96 153 <br /> Total Peak-Hour Trips(Inbound+Outbound) 138 192 306 <br /> Cemex Vernalis 0"n,Mining and Reclamation Project 4-28 ESA 1203015 <br /> Final Environmental Impact Repoli June 2008 <br />