Laserfiche WebLink
Cemex Vernalis Quarry Mining and Reclamation Project <br /> Project Study Report for an interchange to replace the existing intersection. The proposed <br /> interchange is expected to mitigate the cumulative impacts to the intersection through 2025. The — <br /> project will be required to contribute an equitable share of the cost of the interchange or nay <br /> established development fees. <br /> Intersection of Koster Road and SR 132 <br /> 4he e!6sting traffie velumes indicate that the intefseetion of Koster-Read and SR 132 was <br /> operating at aeeeptable level of sewice at t-he t-im-e- the. e eunts were talizen (Januafy 2004. <br /> L seasonalI adjustments 1, e f se�..: C <br /> ee _the«...thbetind .. - vel. :.. LOS T <br /> level <br /> .1 <br /> A A - 1 eenA' ons _. <br /> without the prejeet the level o fse.. : o fey theneRhbeund — <br /> appfeaeh will remain LOS D. in the fulum without the prejeet,the nefthbound and southbound <br /> The intersection of Koster Road <br /> and SR 132 is currently operating at unacceptable levels of serviceNeither of the proposed haul — <br /> routes 11 or 3)will utilize Koster Road at this intersection Therefore.the project will not create <br /> new turning movements and will only result in new through movements on SR 132. The poor <br /> levels of service are primarily the result of the difficulty that would be experienced by drivers — <br /> attempting to tum left or proceed through across both directions of SR 132. Project-specific <br /> significant impacts are not identified at the intersection. The pending Bird Road interchange is <br /> expected to provide an alternate route for traffic currently using Koster Road. <br /> >,at cre.. e«signal 'u be v1 Route Optien will net he recommended by staff. <br /> Tlius <br /> this ' e Koster Dead at this leeetie« <br /> Intersection of Welty Road and SR 132 <br /> T1. existing tFaffie vAiNnes indipgte that the:«teRection of lVelty Read and cn 132 was <br /> and thp intiarweti an is wiipeeted to continue to operate at an acreptable levels of FeFviGe with the <br /> proposed project with either of the two propesed haul reutes.Noither of the propesed haul Fautes <br /> would place projeci ifaffic on Welty Read. In th-A f3ture vVitheut the pr-aject,the northbound <br /> ap <br /> The analyses indicate that the <br /> intersection of SR 132 and Welty Road is currently operating at a level of service F. The poor <br /> level of service is primarily the result of the difficulty that would be experienced by drivers on <br /> nerthbeued Welty attempting to tum left across traffic on SR 132. Haul Route 1 will result only <br /> in additional through movements on SR 132 Therefore project-specific significant impacts are <br /> not identified. 44le futureff volurnes on Welty n a are e`r--..,.tea to be minimal,and it is net <br /> antieipateA that trafflesignal ll hs met This .«temeetion will ultimately be.7em...,e.1 <br /> ' 1, eenstmetion of-an . dr <br /> vee :'� a.n.,. _._e <br /> _.'ay. <br /> Intersection of McCracken Road and SR 132 — <br /> Existing tr CC Nieltimes indileate that the :« eetie« of T4,eCmeke« Dead and CD 132 was <br /> operating at rieeeptable levels ef sepviee at!he time the tm_ffie eaunts were talEen (januaty 2004)i <br /> Cemex Vernalis Quarry Mining aM Raclamaaon Project 4-32 ESA 1203015 <br /> Final Environmental Impact Repon June 2008 <br />