My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Minor Revisions to the Draft Environments{Impact Report <br /> r <br /> Measure 4.4.1c: As a condition of approval,the applicant will be required to contribute an <br /> 6. equitable share of the cost of installing new traffic signals and construction of a separate <br /> southbound left-tum lane and protected left-turn phasing at the intersection of Bird Road <br /> and Blewett Road. Traffic signal warrants must be satisfied at this intersection for <br /> ►. implementation of this measure. These proposed improvements are expected to mitigate the <br /> cumulative impacts to the intersection (for Haul Route 1). <br /> Measure 4.4.1d: The proposed project will be conditioned to operate at a maximum <br /> annual production of 1.33 million tons while Haul Route 3 is in operation. If the proposed <br /> project is limited to 1.33 million tons per year,the near-term with-Project level of service <br /> •. will be C and no significant impacts will occur. To mitigate significant impacts in the <br /> cumulative conditions,the proposed project may be conditioned to eliminate Haul Route 3 <br /> after the construction of the Bird Road/SR 132 interchange, at which time only Haul Route <br /> Ir 1 would be allowable. <br /> Measure 4.4.1e: In order to address safety concerns associated with Haul Route 3 through <br /> the SR 33/Welty Road intersection,the proposed project will be required to implement the <br /> following improvements to this intersection to the extent feasible: <br /> • Construct 4-foot shoulders beyond the outermost truck wheel tracks. <br /> • Reconfigure intersection striping to prevent turning trucks from crossing over double <br /> yellow stripes. <br /> • Install signage to warn trucks about blocking,the railroad tracks. Consult with Union <br /> Pacific regarding any additional measures needed. <br /> • Reconfigure traffic stripes and trim or remove trees and vegetation to eliminate <br /> horizontal sight distance constraints. <br /> t` 0 Construct acceleration and deceleration lanes at the intersection for trucks turning <br /> right onto southbound Welty and northbound trucks turning left onto State Route 33. <br /> Impact Significance After Mitigation: Less than significant. <br /> Regional Roadway Operations <br /> Impact 4.4.2: The project would increase traffic on regional roadways in the project <br /> vicinity. This would be a potentially significant impact. <br /> ` A discussion of the project's potential impact to each roadway segment is provided below: <br /> L <br /> Cemex Vernalis Quarry Mining and Reclamawn Pmja4 4-37 ESA 203015 <br /> 1" Final Emironrrenhl Impact Report June 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.