My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cemex Vernalis Quany Mining and Reclamation Pmject <br /> Bird Road Between Blewett Road and SR 132 <br /> Bird Road currently operates at LOS A and is expected to continue to operate at acceptable levels <br /> of service with the proposed project through the year 2025. <br /> SR 132 Between Interstate 580 and McCracken Road <br /> The analysis concludes that the segments of SR 132 that consist of only one lane in each direction <br /> are currently operating at LOS D.Where SR 132 is a four-lane divided highway,the road <br /> segment operates at acceptable levels of service.With construction of the project, similar levels <br /> of service,ranging from LOS D to LOS E are expected to result. Based on these factors, it is <br /> concluded that SR 132 should be widened to two travel lanes in each direction if the interchange <br /> is not completed.With construction of two additional lanes in each direction, SR 132 is expected <br /> to operate at acceptable levels of service through the year 2025. <br /> Rle...e«« Read a entl. epefates at LOS n and: eiEpeeted to ,.,....:«..e.,. ,. _..«e ..t aeeeptable <br /> levels of sefyiee with the projeet thFeugh the yeaF 2025. <br /> Blewett Road Between Bird Road and Welty Road <br /> Blewett Road currently operates at LOS A and is expected to continue to operate at acceptable <br /> levels of service with the project through the year 2025. <br /> RIAiiiiiAtt Road Rati.m.peen Interstate 5 2nd Koster Road <br /> Ble.. ««Read a e««l. epefates at LOS n and is peeled to .......:....e.,. ,. ...«e ... ., eptabl <br /> level.. ..f se fyiee with the p_ejeet R.._a ugh the year 2025 <br /> Welty Road Between Blewett Road and SR 132 <br /> Welty Road currently operates at LOS A and is expected to continue to operate at acceptable <br /> levels of service with the project through the year 2025. <br /> Mitigation Measures <br /> Measure 4.41: <br /> PFeject sponsor will be required te eentribute an equitable share ef the cost of the widening <br /> of SR 132 to two lanes in eaeh diFeetion between 1580 and MeCraeken Read or <br /> sempaFau mitigation r re Rby rel«....... The fee ...:11 ,. :..a,fan :,.:tialc <br /> A a per ton delivered off site fee,based an the equitable share of the pr «_a.1F:,.eef-s <br /> impaet and quantity ef delivered material. With constmoisn sf two Infles in each direetion, <br /> SR 132 is expected to experieneo acceptable levels of san,iee thfough the 54M <br /> 2925-1mnlement Mitigation Measure 4.4.lb. <br /> Impact Significance After Mitigation: Less than significant <br /> Cemex Vernals Quarry Mining and Reclamation Project 4-38 ESA 12M15 <br /> Final Emaonmental Impact Report June 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.