Laserfiche WebLink
4.Minor Revisions to the Draft Environmental Impact Report <br /> r <br /> Other Impact Issues <br /> impaet 4.4.3: if Haul Route Option 2 is approved,projeet generated haul truck traffie <br /> wouId eause an inereased traff:e safety L.,.-.,..d at the intersection of State Route 132 find <br /> Koster Road. This would be a patentially signifleant impact.- <br /> Under the Option 2 haul reute seenario,the pirejeet would add inbound tmffie,mest netieeably <br /> haul k t-efe te the loft t....., and right t..-n movements fire.., SR 132 to Kester Read <br /> Currently there are no left tuFn lanes, and ne full width right turn lanes, on SR 132 at Kest@ <br /> a. <br /> Raad <br /> ►� <br /> speed,but the shouldefs are net wide e. eugh to fully titee......nedate a 1,..,.1 t.,..,1. This..eeld <br /> repfesefft a signifieant safky hazard because there is enly one tFavel lane on SR ' <br /> and 4affie <br /> QR 132 travels et high speeds <br /> .. <br /> Mitigation Measure <br /> AAS A A 2. if l4 . 1 Route Option 2 is d the - 'eet e., lieant aidd be <br /> ` approved,the j.,ej.. »Yi.......... <br /> interseetien of SR 132 and Koster Read (ineluding left turn lanes and <br /> aeeelemfien/deeelefation lanes). <br /> i. pnet Signif1.,. nee After Mitigation if Mitigation Measure A A 3 were funded and <br /> implemented, the tFafCe sa fi t. ifnpae4,,weld be -educed to a less than ,. gni fieant level. <br /> Impact 4.4.4 4.4.3: Project-generated traffic could result in accelerated pavement <br /> deterioration on study area roadways. This would be a potentially significant impact. <br /> The traffic index(TI)is a measure of the number of equivalent single axle loads (ESALs) <br /> expected over the design period,and is described in detail in the Caltrans Highway Design <br /> Manual. The existing ESALs on Blewett and Bird Roads were estimated by performing 24-hour <br /> traffic counts and by a review of the environmental impact reports for Brown Sand and Gravel <br /> and Teichert Aggregates. The following table presents a summary of the traffic index TI analyses. <br /> The supporting calculations are presented in Appendix E of the traffic impact study. <br /> The TI analyses suggest that the proposed project and Haul Route 1 will create potential <br /> pavement impacts on Blewett Road between I-5 and Koster Road. The analyses also suggest that <br /> the proposed project and Haul Route 3 will create potential pavement impacts on Blewett Road <br /> between Koster Road and Welty Road.However, it is noted that the TI analyses are based on a <br /> 20-year pavement design life. Therefore,if Haul Route 3 if considered only as a short-term option <br /> then a significant impact would not be identified. <br /> LConsidering that this traffic impact study is not a design-level document,it is not recommended <br /> that the traffic index values presented herein be used for design purposes. More extensive traffic <br /> counts would be required for design;however,this information provides some estimate of the <br /> ` need for roadway upgrades resulting directly from project-generated traffic. <br /> Cemex Vernalis Quarry Mining and Reclamation Project 4-39 ESA/203015 <br /> Final Environmental Impact Report June 2008 <br />