Laserfiche WebLink
4.Minor Revisions to the Draft Environmental Impact Repod <br /> fvn <br /> SR 132 Koster Road to 12.5 13.0 13.0 <br /> McCracken Road <br /> r <br /> Bold Indicates a significant impact. <br /> ` Source:Peters Engineering Group 2006. <br /> RR 132 RettAirean Interstate 520 and P.Accrackan Road <br /> r Th pfejeet applicant or..........sser in :..*,.fest..hall be . fed t.. ..entr:lltite to the Cost_e <br /> pavefnefft s4metural section upgrades be�ween Bird Read and latenstate 5. T11e eentribution <br /> te upgfades would be requifed fef both difeetions ef travel h-aased-en 14-aul--R-oute Option 1, <br /> Th prejeet applied t or....,...ossor in interest shall eentfibute its f if shafe to A.tur <br /> pm,ement upgrades en this read segment. <br /> V <br /> Blewett Road Between Interstate 5 and Koster Road <br /> The project applicant or successor-in-interest shall contribute its fair share to future <br /> pavement upgrades on this road segment. <br /> KGStOF Road Rpb--.Fppn RIej.tFq%tt Road and SR 132 <br /> lead segment if Haul RetAe Optien 2 were selected. The pfejeet will net utilize this peftieft <br /> ef Kestef Read with Haul Route Optien 1. <br /> Impact Significance After Mitigation: Less than significant. <br /> HOW Routo <br /> impnet 4.4.5! implementation of Haul Route 3 eould result in level of serviee4nvpaet&-at4he <br /> ntpr-sPFt; ig of QD 12 and Welty Road This impart is less than significant. <br /> ficant. <br /> After eempletien of the dmfl tFaffie impact study for the pfejeet, a third petential haul route was <br /> ridAlg1*fiAd 4 tAAhnqP memorandum addressing the implementaien of the third haul retite is <br /> included in its entirety in Appendix C, Patt iii, of this EIR. The third haul mute consists of. <br /> Haul Route 3: This a-UPFnative invelves tFueks leaving the site and traveling aeM an Koster <br /> Road to Blowett Road, east on Blewett Read to Wehy Read, nefth en Welty Read to <br /> SR ZZa Elefd...es .. Be Interstate an ,terlOD ZZ to C d furtheres4inat:ens(see Appendix f <br /> INN Haid Reuty � on the intenseetion of SR 33 and Welty Read. EXisting conditions for all appFeaches <br /> L <br /> Cemex Vernalis Quarry Minlnq and R. .tion Project 4-41 ESA 1203015 <br /> FMal Environmental Impact Report June 20M <br /> L <br />