Cemex Vernalis Quany Mining and Reclamation Pmject <br /> 4.6.2 Impacts and Mitigation Measures <br /> Mitigation Measures <br /> Measure 4.6.1: The project applicant shall comply with SJVAPCD's Regulation VIII <br /> control measures and shall retain-have an on-site air quality monitor to ensure compliance <br /> with the SJVAPCD's Regulation VIII control measures. The monitor must be familiar with <br /> the SJVAPCD Regulation VIII Fugitive PMio Prohibitions,including implementation of all <br /> feasible control measures specified in the SJVAPCD's Guide for Assessing Air Quality <br /> Impacts. <br /> Impact Significance After Mitigation: With implementation of the above mitigation <br /> measures in compliance with Regulation VIII,the project construction impacts would be _ <br /> less than significant. <br /> Impact 4.6.2: Project Operational-Phase Emissions Impact. The proposed surface mining <br /> of topsoil,sand and gravel would take place on approximately 659 acres within the Project <br /> Site,consisting of the extraction and processing of 1.7 to 4.0 million tons per year of <br /> aggregate materials over a 26 to 60 year period. The impacts of operational air quality <br /> emissions of criteria pollutants are potentially significant. <br /> Emissions from operations would include the processing facility, Ready Mix Concrete Plant, <br /> Asphalt Plant and a concrete recycling plant. The processing facility would consist of conveyors, <br /> screens, crushers, scrubbers,and stockpiles. There would be a Ready Mix Concrete Plant and an <br /> Asphalt Plant. A portable,concrete recycling plant,owned and operated by an outside contractor, — <br /> would intermittently be placed in the middle of the plant site to produce base material. The Ready <br /> Mix Concrete Plant,with an estimated production of 350,000 cubic yards per year,would include <br /> a cement silo, aggregate bins, conveyors,baghouse, bermed admixture tank farm, reclaimer and — <br /> concrete lined washout basins. The asphalt plant, with an estimated production of 400,000 tons <br /> per year,would be owned and operated by others. It would include a batch tower, aggregate bins, <br /> baghouse,and hot oil tanks. <br /> Approximately 75 percent of the processing plant would involve a wet screening process. The <br /> wet plant would consist of scrubbers, crushers,coarse material washers,fine material washers, <br /> conveyors, and wet screens for washing and sizing of materials. The other approximately <br /> 25 percent of the material would be processed through a dry circuit. This circuit would consist of <br /> conveyors, crushers, and dry screens for the sizing of the crushed aggregates. <br /> Excavators would be used for the harvesting of the sand and gravel lenses. Haul trucks would be <br /> loaded with sand and gravel material for a short haul from the excavator to a field conveyor line. <br /> Loaders would be used within the plant area for truck loading of some of the sand and gravel <br /> products. The graders and compactors would be used for haul road maintenance and the building — <br /> of reclamation structures (i.e., land engineered structures to provide reclamation). <br /> Cemex Vernalis Quarry Mining and Reclamation Project 4-44 ESA/203015 .-. <br /> Final Emronmental Impact Repoli June 2008 <br />