My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cemex Vernalis Quany Mining and Reclamation Pmject <br /> 4.6.2 Impacts and Mitigation Measures <br /> Mitigation Measures <br /> Measure 4.6.1: The project applicant shall comply with SJVAPCD's Regulation VIII <br /> control measures and shall retain-have an on-site air quality monitor to ensure compliance <br /> with the SJVAPCD's Regulation VIII control measures. The monitor must be familiar with <br /> the SJVAPCD Regulation VIII Fugitive PMio Prohibitions,including implementation of all <br /> feasible control measures specified in the SJVAPCD's Guide for Assessing Air Quality <br /> Impacts. <br /> Impact Significance After Mitigation: With implementation of the above mitigation <br /> measures in compliance with Regulation VIII,the project construction impacts would be _ <br /> less than significant. <br /> Impact 4.6.2: Project Operational-Phase Emissions Impact. The proposed surface mining <br /> of topsoil,sand and gravel would take place on approximately 659 acres within the Project <br /> Site,consisting of the extraction and processing of 1.7 to 4.0 million tons per year of <br /> aggregate materials over a 26 to 60 year period. The impacts of operational air quality <br /> emissions of criteria pollutants are potentially significant. <br /> Emissions from operations would include the processing facility, Ready Mix Concrete Plant, <br /> Asphalt Plant and a concrete recycling plant. The processing facility would consist of conveyors, <br /> screens, crushers, scrubbers,and stockpiles. There would be a Ready Mix Concrete Plant and an <br /> Asphalt Plant. A portable,concrete recycling plant,owned and operated by an outside contractor, — <br /> would intermittently be placed in the middle of the plant site to produce base material. The Ready <br /> Mix Concrete Plant,with an estimated production of 350,000 cubic yards per year,would include <br /> a cement silo, aggregate bins, conveyors,baghouse, bermed admixture tank farm, reclaimer and — <br /> concrete lined washout basins. The asphalt plant, with an estimated production of 400,000 tons <br /> per year,would be owned and operated by others. It would include a batch tower, aggregate bins, <br /> baghouse,and hot oil tanks. <br /> Approximately 75 percent of the processing plant would involve a wet screening process. The <br /> wet plant would consist of scrubbers, crushers,coarse material washers,fine material washers, <br /> conveyors, and wet screens for washing and sizing of materials. The other approximately <br /> 25 percent of the material would be processed through a dry circuit. This circuit would consist of <br /> conveyors, crushers, and dry screens for the sizing of the crushed aggregates. <br /> Excavators would be used for the harvesting of the sand and gravel lenses. Haul trucks would be <br /> loaded with sand and gravel material for a short haul from the excavator to a field conveyor line. <br /> Loaders would be used within the plant area for truck loading of some of the sand and gravel <br /> products. The graders and compactors would be used for haul road maintenance and the building — <br /> of reclamation structures (i.e., land engineered structures to provide reclamation). <br /> Cemex Vernalis Quarry Mining and Reclamation Project 4-44 ESA/203015 .-. <br /> Final Emronmental Impact Repoli June 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.